Maps and Records
Construction Plan I-2020-024
Plan # | I-2020-024 |
---|---|
Plan Type | I - Paving Improvements Plans |
Film Roll | |
Location | |
Description | Bella Tierra - Phase 1B, Paving and Public Sewer Improvement plans, Lots 136-227 with common areas "A" and "B", east of Camino Seco and north of Irvington Road and containing Stone Meadow Circle, Stone Bluff Street, Pebble Stone Lane, and Linderbrook Drive, including new paving, sidewalks, curb, ramps, catch basins and storm drains (Rick Engineering) |
Scanned | Yes |
Documents | Click on a filename to download the document |