Maps and Records
Construction Plan I-2024-020
| Plan # | I-2024-020 |
|---|---|
| Plan Type | I - Paving Improvements Plans |
| Film Roll | |
| Location | |
| Description | Phase 2 Bella Tierra Phase 4, Paving Improvement plans, Phase 2 Lots 1-53 & 201-205 with common areas "A-1", "A-2", "B-1" and "B-2", "C-3" and "C-6" - containing new roads of Aero Avenue, Chainstay Street, Cog Street, Downshift Drive, Leadout Road, Paceline Street, Sprinter Drive, and Switchback Drive - includes arch culverts, RCP storm drain (18" & 34"x24"), 24" SRP (Aluminized Steel Pipe) storm drain, new pavement, curb, sidewalk, ramps, scuppers, and drainage (Rick Engineering) |
| Scanned | No |
| Documents | No documents found. |

