I-2011-001 |
Public Roadway Plans -- Park Avenue Between I-10 And 36th Street Improvements |
|
Yes |
I-2011-002 |
Park Avenue, Between I-10 and 36TH Street paving improvement plans VOID VOID VOID |
|
No |
I-2011-003 |
MISSION DISTRICT LINDA AVENUE ROADWAY IMPROVEMENT PLANS |
|
Yes |
I-2011-004 |
NWC HARRISON ROAD AND OLD SPANISH TRAIL, OFFSITE WIDENING AND STRIPING PLANS |
|
Yes |
I-2011-005 |
THE DISTRICT, OFFSITE IMPROVEMENT PLANS |
|
Yes |
I-2011-006 |
NOBEL WAY (M L KING JR WAY), Paving Improvement Plan (NOTE: Road maintained by COT per easement agreement. See attached IGA & License Agreement for exact details). |
|
Yes |
I-2011-007 |
Quiktrip Store, Number 1454, Located North Of 1st Street, West Of Glenn Street, Within Section 31, T13S, R14E, Gila And Salt River Meridian, City Of Tucson, Pima County, Arizona |
|
Yes |
I-2011-008 |
ANDRADA POLYTECHNIC AND PANTANO HIGH SCHOOL, HOUGHTON ROAD OFFSITE PAVING IMPROVEMENT PLANS |
|
Yes |
I-2011-009 |
Camino Seco - Wrightstown Intersection Improvements.
NOTE: NO PLANS.
NOTE: SEE I-2011-013.
NOTE: Email indicates that this was a new plan number assigned to the protested and not built I-2000-013 with the limits to be expanded to include Camino Seco - Wrightstown Intersection. AECOM was to draft the redesign. NO Plans Found. AECOM designed the I-2011-013 Camino Seco and Wrightown Rd Traffic Signal Improvements which indicate they also built the median pork-chop island and rebuilt the intersection. |
|
No |
I-2011-010 |
OFFSITE IMPROVEMENT PLANS FOR LA FITNESS, GOLF LINKS RD. AND CATHY AVENUE |
|
Yes |
I-2011-011 |
22nd Street Buffer - Kino Parkway To Tucson Boulevard, Consultant AECOM |
|
Yes |
I-2011-012 |
TUCSON MEDICAL CENTER, GRANT ROAD RIGHT TURN LANE IMPROVEMENTS |
|
Yes |
I-2011-013 |
Camino Seco and Wrightown Rd Traffic Signal Improvements - (AECOM) - (As Built).
NOTE: This project also rebuilt the intersection and includes the "prok-chop" median island and speed table. Project was on-going in Spring 2013. |
|
Yes |
I-2011-014 |
OFFSITE IMPROVEMENT PLANS FOR QUEBEDEAUX BUICK-GMC PALO VERDE BLVD. |
|
Yes |
I-2011-015 |
Golf Links Rd - Aviation Parkway Intersection Improvements - Bike Lanes Package Number 3, Job Number 49B3 |
|
No |
I-2011-016 |
THE RETREAT, 22ND STREET AND PARK AVENUE |
|
Yes |
I-2011-017 |
CIRCLE K, SPEEDWAY BLVD. AND CRAYCROFT ROAD OFFSITE IMPROVEMENT PLANS, 5502 E. SPEEDWAY |
|
Yes |
I-2011-018 |
Rita Road Improvements from Union Pacific Railroad (UPRR) to Interstate 10 (I-10) |
|
Yes |
I-2011-019 |
SILVERBELL ROAD AT 550 N. SILVERBELL ROAD |
|
Yes |
I-2012-000 |
- 2012 - Class 'I' - PAVING IMPROVEMENTS: Paving and Widening Plans And Drawings. - 2012 - |
- 2012 - |
No |
I-2012-001 |
CIRCLE K, MIRACLE MILE AT FLOWING WELLS, OFFSITE IMPROVEMENT PLANS |
|
Yes |
I-2012-002 |
Grande Avenue - Speedway Boulevard To Saint Marys Road Hardscape Plan |
|
Yes |
I-2012-003 |
SUNNYSIDE POINTE, LOTS 32 THRU 59 AND LOTS 203 THRU 267, PUBLIC ROADWAY PLAN, LOCATED SOUTH OF IRVINGTON ROAD, EAST OF UNION PACIFIC RAILROAD, WEST OF PARK AVENUE, WITHIN SECTION 6, T15S, R14E, GILA AND SALT RIVER MERIDIAN, CITY OF TUCSON, PIMA COUNTY, ARIZONA |
|
Yes |
I-2012-004 |
Pantano Road Reconstruction: Irvington Road to Escalante Road |
|
Yes |
I-2012-005 |
Offsite Public Improvement Plan for Salpointe Catholic High School North Campus Improvements
Deceleration lane on Glenn Street, sidewalk on Cherry Avenue |
|
Yes |
I-2012-006 |
Walgreens - 1st Ave and Grant Road offsite improvements |
|
Yes |
I-2012-007 |
Public Improvement Agreement (PIA) --THE PLACE AT PRESIDIO TRAIL OFFSITE IMPROVEMENTS,
9193 E. Old Spanish Trail --Section 15, T14S, R15E-- (Rick Engineering) |
|
Yes |
I-2012-008 |
Downtown Links: 6th Street Underpass to Broadway - (HDR Engineering)VOID VOID See I-2013-018 |
|
No |
I-2012-009 |
Downtown Intermodal Center Pedestrian Safety and Bus Access Improvements -
(Parsons Brinkerhoff) |
|
Yes |
I-2012-010 |
Headley Road And Oak Tree Drive Improvement Project -- Installation of Traffic Island and Speed Table |
|
No |
I-2012-011 |
UTILITY PLAN FOR JULIAN WASH TRAIL KOLB ROAD CROSSING |
|
Yes |
I-2012-012 |
Senior Care Facility Tanque Verde and Catalina Hwy - Right turn lane, 9050 E. Tanque Verde Road |
|
Yes |
I-2012-013 |
Silverbell Road - Goret Road to Grant Road, Roadway and Paving Improvements -- Designer Kittelson & Associates |
|
Yes |
I-2013-000 |
- 2013 - Class 'I' - PAVING IMPROVEMENTS: Paving and Widening Plans And Drawings. - 2013 - |
- 2013 - |
No |
I-2013-001 |
Sears Blvd, Bilby Rd to Valencia Rd Roadway Reconstruction |
|
Yes |
I-2013-002 |
Curb Additions for Brewery Block, Broadway Blvd. between 5th Ave. and Herbert Ave. |
|
Yes |
I-2013-003 |
UNIVERSITY OF ARIZONA,Science Park Drive / Kolb Road Improvements,
7762 E. SCIENCE PARK DRIVE |
|
Yes |
I-2013-004 |
Grant Road - Stone Avenue to Fremont Avenue -- Psomas. Note: VOID (no plans) - see I-2013-009. |
|
No |
I-2013-005 |
St. Augustine Catholic High School Offsite public paving improvements, at Camino Seco & 22nd Street |
|
Yes |
I-2013-006 |
Houghton Road, Broadway Boulevard to 22nd Street Roadway Improvement Project |
|
Yes |
I-2013-007 |
Linda Ave Extension (Mission District), 795 W CONGRESS |
|
Yes |
I-2013-008 |
Haciendas at Wrightstown, Lots 1-12 and Common Area A, Public Paving Improvement,
1665 N. Brown Avenue |
|
Yes |
I-2013-009 |
Grant Road - Stone Avenue to Park Avenue -- Psomas |
|
Yes |
I-2013-010 |
Public Improvement Agreement (PIA) -- Public Roadway Plan for The Bridges -- Block 10, Phase I -- 3300 S Park Ave -- Park Avenue and Tucson MarketPlace Boulevard -- T14S, R13E, Section 25 and T14S, R14E, Section 30 -- (5151 East, LLC) |
|
Yes |
I-2013-011 |
Houghton Road at Golf Links Road Imp -- QuikTrip No 1487 |
|
Yes |
I-2013-012 |
Hurricane Car Wash NE Corner of 22nd Street and Park Avenue, 909 E 22nd St, alley paving, Within Section 18, T14S, R14E, City Of Tucson, Pima County, Arizona, Gila And Salt River Meridian (WLB) -- As-Built. |
|
Yes |
I-2013-013 |
PUBLIC PAVING PLANS FOR MIRAMONTE AT GLENN STREET, SILKIE PLACE |
|
Yes |
I-2013-014 |
OFFSITE IMPROVEMENT PLAN FOR MARANA MARKETPLACE PHASE 3 |
|
Yes |
I-2013-015 |
CANTERA - NORTH PHASE PAVING, SEWER, AND DRAINAGE PLANS - Lots 1 - 72 (paving), 1 - 105 (Sewer), Common Areas "A" (Park/landscaping), "B" (Drainage) and "C" (Detention/retention Basin/Multi Use Area), Blocks A and B - (EPS)
NOTE: See MP 63-044 - NOTE: Not all sidewalks completed by the time of Record Document - see Acceptance Letter. |
|
Yes |
I-2013-016 |
CANTERA-SOUTH PHASE LOTS 73 - 143, PAVING, SEWER, AND DRAINAGE PLANS, Common Areas "A" (Park/landscaping), "B" (Drainage) and "C" (Detention/Retention Basin/Multi Use Area), Blocks A and B - (EPS)
NOTE: See MP 63-044 |
|
Yes |