U-2006-006 |
TEA 21C #4C -- Overlay and Resurfacing Projects -- Cherrybell Stravenue, from 22nd Street to Silverlake Road -- Greasewood Road, from Speedway Boulevard to Anklam Road -- Rocket Stravenue from Rita Road to Brekke Road -- COT Job Number S10M -- (EEC Engineers) -- BID SET -- Current Project |
|
Yes |
U-2006-007 |
10th Avenue: 22nd Street To 43rd Street -- Revitalization Project -- Striping, Signing, And Pavement Marking Plans -- Project By COT Traffic Engineering -- (Tetra Tech) |
157 |
Yes |
U-2006-008 |
BACK TO BASICS, 16TH STREET AT EUCILD AVENUE - SIDEWALK IMPROVEMENTS
DESIGN ENGINEERING, JOB NO. A781 |
157 & 162 |
Yes |
U-2006-009 |
FIRE STATION #3-BROADWAY BOULEVARD AND NORRIS AVENUE, HAWK SIGNAL
NOTE: THIS TRAFFIC SIGNAL WAS BUILT IN THE FIELD BY THE CITY OF TUCSON, TRAFFIC ENGINEERING DIVISION -- As-Built. |
|
Yes |
U-2006-010 |
Grant Road and Dragoon -- Hawk Signal, Solar Powered -- Note: this traffic signal was built in the field by the city of Tucson (COT), traffic engineering division -- As-Built. |
|
Yes |
U-2006-011 |
Fire Station Number 22 Warning Flasher -- At Alvernon Way, North Of Alvernon Point Drive -- Hawk Signal, Solar Powered -- Note: This Traffic Signal Was Built In The Field By The City Of Tucson (COT), Traffic Engineering Division -- Not Built, Under Construction |
|
Yes |
U-2006-012 |
RTA -- Bus Pullouts, Package II -- VOID -- VOID -- See U-2006-017 |
|
No |
U-2006-013 |
Drexel Road And Santa Clara -- Hawk Flasher Signal |
159 & 162 |
Yes |
U-2006-014 |
Starr Pass Bl And La Cholla Bl -- Traffic Signal (HDR Engineering) |
161 |
Yes |
U-2006-015 |
RTA Sidewalk Improvements -- Part Of Package 1 -- Eastside Of Alvernon Way, Broadway Boulevard To 22nd Street -- (City Of Tucson) -- COT Job Number SK01 -- Current Project |
|
No |
U-2006-016 |
RTA Bus Pullouts -- Package III -- Cot Job Number SB03 (Record Document Dated: 11/06/2020)
NOTE: PDF and red-lines available on request (17 pgs) |
162 |
Yes |
U-2006-017 |
RTA, Bus Pullout, Package II -- Images 1-15 are complete plans with redline notes for Park/Ajo & Speedway/6th Bus Pullouts. Images 16-30 represent the contract that built Stone/Yavapai & Oracle/Grant Bus Pullouts. Park/Ajo & Speedway/6th Bus Pullouts were likely built at a different time, but still used the same plan set, hence the "N.I.C." notations. (City Of Tucson Engineering Craig Saltzman) |
162 |
Yes |
U-2006-018 |
Glenn Street Sidewalk Improvements -- B2B -- Olsen Avenue To Tucson Boulevard -- North Side Only |
158 |
Yes |
U-2007-000 |
- 2007 - Class ''U'' - TRAFFIC AND PARKING CONTROL: Signals, Flow Maps, Striping, Overlay Programs, Paving on City Property, Bicycle Paths, & Barriers, Sidewalks. - 2007 - |
- 2007 - |
No |
U-2007-001 |
Limberlost Road Median Striping -- East of Oracle Road -- (City Of Tucson) |
158 |
Yes |
U-2007-002 |
Swan Road ADA Upgrades -- Camp Lowell Road To 22nd Street |
|
No |
U-2007-003 |
ITS - CMS Signs on Smart Arterials -- Prince Road East of Flowing Wells Road, Grant Road At Castro Avenue |
|
Yes |
U-2007-004 |
RTA Sidewalks, Package 2, 22nd Street - Alvernon Way to Swan Road, Broadway Boulevard - Alvernon Way to 22nd Street, Craycroft Road - Broadway Boulevard to 22nd Street, Mission Road - Ajo Way to Irvington Road, Tanque Verde Road - Kolb Road to Sabino Canyon Road |
162 |
Yes |
U-2007-005 |
A-Mountain Community Wall -- Back To Basics -- COT Job Number A739 |
|
Yes |
U-2007-006 |
Feldmans Neighborhood Reinvestment Project -- Sidewalks -- Bounded by Stone Avenue to the west, Lee Street to the north, Park Avenue to the east, and Speedway Boulevard to the south -- Drachman Street, 1st Avenue, 4th Avenue, Helen Street, and Mabel Street |
|
Yes |
U-2007-007 |
Old Pasqua Neighborhood Sidewalk Improvements -- Pima County Neighborhood Reinvestment Program -- North Calle Central - From West Calle Matus To West Calle Ventura -- COT Job Number R058 |
162 |
Yes |
U-2007-008 |
Fort Lowell Road - Oracle Road To First Avenue Street Lighting and Sidewalk Improvements |
|
No |
U-2007-009 |
A-Mountain Neighborhood Reinvestment Project, Sidewalk |
|
No |
U-2007-010 |
City of Tucson RTA (Regional Transportation Authority), Sidewalk Improvements, Package 2 |
|
No |
U-2007-011 |
Amphi Neighborhood Street Lighting and Sidewalks |
|
Yes |
U-2007-012 |
Back to Basics Sidewalk Improvements, Sarnoff Drive - Jesse Owens Park and Sunset Cove |
|
Yes |
U-2007-013 |
RTA BUS PULLOUTS, PACKAGE 1B, BROADWAY BOULEVARD AT ALVERNON WAY |
|
Yes |
U-2007-014 |
Jefferson Park Neighborhood Improvement Project -- Sidewalk Installation -- Hampton Street and Seneca Street, Park Avenue to Mountain Avenue (Record Document Dated: 11/04/2020) (5 pgs) |
|
Yes |
U-2007-015 |
Stone Avenue Prototype Bus Shelters -- Speedway Boulevard to 6th Street -- Current Project |
|
No |
U-2007-016 |
Rincon Heights Neighborhood Reinvestment Project -- 9th Street and 10th Street between Park Avenue and Campbell Avenue |
|
Yes |
U-2007-017 |
University of Arizona Public Transit Facility Improvements -- Cherry Avenue |
|
No |
U-2007-018 |
Traffic Striping Plan, Pantano Road - Broadway Boulevard to 22nd Street |
159 |
Yes |
U-2007-019 |
Temporary Greyhound Bus Terminal -- 471 West Congress Street -- Architectural Plans -- (L2 Architects) -- To Be Scanned, Filmed, and Destroyed |
159 |
Yes |
U-2007-020 |
Grant Road Sidewalk Improvements -- RTA Sidewalk, Package 1a, Number 3 of 4 Locations -- Grant Road, Dragoon Road To Interstate 10 (I-10) -- COT Job Number SK01P6 |
162 |
Yes |
U-2008-000 |
- 2008 - Class ''U'' - TRAFFIC AND PARKING CONTROL: Signals, Flow Maps, Striping, Overlay Programs, Paving on City Property, Bicycle Paths, & Barriers, Sidewalks. - 2008 - |
- 2008 - |
No |
U-2008-001 |
14th street and 6th Avenue HAWK Signal --(Parsons Brinkerhoff) |
162 |
Yes |
U-2008-002 |
Cushing Street and Stone Avenue HAWK Signal -- (Parsons Brinkerhoff) |
|
No |
U-2008-003 |
Houghton Road - Broadway Boulevard to Old Vail Road -- FEMA Grading Improvements -- (PSOMAS) |
|
No |
U-2008-004 |
Tanque Verde Road at Dos Hombres Road -- RIght Hand (East Bound) Turn Lane Improvements |
|
No |
U-2008-005 |
Cambio Grande Streetscape Enhancement, Grande Avenue from Saint Mary's Road to Speedway Boulevard -- Sidewalks, ADA access ramps, driveways, a HAWK signalized cross walk, and other miscellaneous streetscape enhancements |
|
Yes |
U-2008-006 |
El Paso and Southwestern Greenway -- Simpson Street to 22nd Street - (Kimley - Horn)
(Record Document Dated: 10/18/2020) (34 pgs) |
|
Yes |
U-2008-007 |
Treat Avenue Pedestrian Enhancements |
|
Yes |
U-2008-008 |
RTA Bike Package #1A -- 6th Avenue, 19th Street to South Tucson limits -- 6th Avenue, I-10 to Irvington Road -- Alvernon Way, Speedway Boulevard to Broadway Boulevard -- Alvernon Way, I-10 to Valencia Road -- Campbell Avenue, Glenn Street to Grant Road -- (PSOMAS) |
|
Yes |
U-2008-009 |
RTA Bike Package #1B -- Campbell Avenue, Elm Street to Speedway Boulevard -- Speedway Boulevard, Alvernon Way to Rosemont Boulevard -- Park Avenue, Benson Highway to Ajo Way -- Park Avenue, Ajo Way to Irvington Road -- Pantano Road, Speedway Boulevard to Broadway Boulevard -- (HDR) |
|
Yes |
U-2008-010 |
Oaktree Drive Street Lighting, South of Drexel Road - VOID- SEE F-2008-008 |
|
No |
U-2008-011 |
Campbell Avenue Enhancement, Grant Road to Fort Lowell Road -- Federal Project No. STP TUC-0(205)A -- TRACS No. 0000PM TUC SS632 01C - TDOT Job No. (S237) - (EEC) |
|
Yes |
U-2008-012 |
Euclid Avenue at 6th Street Bus Pullout - RTA Package 4 - (Stantec Consulting) |
|
Yes |
U-2008-013 |
Fort Lowell Road - First Avenue To Campbell Avenue Street Lighting and Sidewalk Improvements |
|
Yes |
U-2008-014 |
Fort Lowell Road - Campbell Avenue To Country Club Road Street Lighting and Sidewalk Improvements |
|
No |
U-2009-000 |
- 2009 - Class ''U'' - TRAFFIC AND PARKING CONTROL: Signals, Flow Maps, Striping, Overlay Programs, Paving on City Property, Bicycle Paths, & Barriers, Sidewalks. - 2009 - |
- 2009 - |
No |