U-2023-020 |
Offsite Improvement Plans for U-Haul Warehouse at 3801 N Runway Drive (PIA) at NW corner of Runway Drive and Highway Drive - Includes new Driveways, Curb, Asphalt, ADA Ramps, and approximately 1350' feet of new sidewalk - (Baker & Associates) |
|
No |
U-2023-021 |
Striping Plan - 6th Avenue from Drexel Road to Thoroughbred Street
T15S, R13E, Section 1
(City of Tucson, Traffic Engineering) |
|
Yes |
U-2023-022 |
GSI Plans For Dietz ROW - this is new Green Water infrastructure along the East-side of Pantano Road south of Sundew Dr and ending just north of Golf Links Road - includes new DG path, raised scupper crossing of drainage channel, retention and detention areas, landscaping, and irrigation for new plants - (Wilder) |
|
No |
U-2023-023 |
UA 2nd Street Bike and Pedestrian Improvements - Olive Road Intersection - Highland Avenue Intersection - work includes converting an alley north of dorms and south of 2nd Street into a multi-use path with an adjoining Decomposed Granite water harvesting area - on Olive Road reconstructed ADA Ramp and curb extend to widen sidewalk on the east side for 300' - Highland Avenue mill and replaced asphalt between 1st Street and 2nd Street - All work on State land (UA) and not in City ROW by Federal Grant - (AECOM) |
|
No |
U-2023-024 |
Proposition 411 Residential Package 7 - Tierra Del Sol Subdivision - Includes New Asphalt, Curb, Sidewalk, Speed Humps and ADA ramps, Treatment is 2" Mill & Fill, Located within Sec 19, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2023-025 |
Proposition 411 Residential Package 8 - Bonanza Avenue South of Tanque Verde Road - includes new asphalt, Treatment is Complete Reconstruction, Located within Sec 19, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2023-026 |
Proposition 411 Residential Package 9 - Barrio Nopal & Elvira Neighborhoods - Includes New Asphalt, Curb, Sidewalk, Speed Humps and ADA ramps, Treatment is 2" Mill & Fill, Located within Sec 13 & 14, T15S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2023-027 |
Proposition 411 Residential Package 10 - Doolen-Fruitvale Neighborhood, Sewell Neighborhood, and Garden District Neighborhood - Includes New Asphalt, Curb, Sidewalk, Speed Humps and ADA ramps, Treatment is 2" Mill & Fill, Located within Sec 33, T14S, R13E, Sec 12, T14S, R14E, and Sec 3, T14S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2023-028 |
Public Sewer Improvement Plan - Woodland Road Sewer - 12" Sewer Main - from Bears Path Road south - includes new 12" sewer main, new sewer manholes, and repaired asphalt - (EEC)
Note: Plans from Pima County (PCRWRD). Contact PCRWRD for Record Document.
Note: Also plan G-2020-092 |
|
No |
U-2023-029 |
Void
|
|
No |
U-2023-030 |
Green Stormwater Infrastructure (GSI) Plans for Pantano Road ROW - From 19th Street south to south of Pantano Parkway on the west-side of the road, also along north-side of Pantano Parkway, includes new curb cuts, rock spillways, 6" HDPE pipes under sidewalk, and retention basins with landscaping - (West Consultants / Wilder Landscape Architects) |
|
No |
U-2023-031 |
Swan Road Multi-Use Pathway - Valencia Road to Fairy Duster Drive - includes new curb, ADA Ramps, sidewalk, multi-use path, and drainage channel - (Kimley>Horn). |
|
No |
U-2023-032 |
Proposition 411, Package 11 - 2023 Surface Treatment Package A - Sam Hughes, Miramonte, Peter Howell, Lakeside Parkway, and Dietz Neighborhoods - Includes New Asphalt, Curb, Sidewalk, Speed Humps and ADA ramps, Treatment is Type 3 Microsurface, Fast, Type 2 Microsurface, Located within Sec 8, 9 & 10, T14S, R14E, and Sec 20 & 28, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2023-033 |
Collector Street Repavement Project - Flowing Wells Road from Miracle Mile to Grant Road & Glenn Street from Flowing Wells Road to Oracle Road - Includes New Asphalt, Curb, Sidewalk, and ADA ramps, Treatment is (TBD), Located within Sec 34 & 35, T13S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2023-034 |
Collector Street Repavement Project - Elvira Road from Plumer Avenue to Palo Verde Road - Includes New Asphalt, Curb, Sidewalk, and ADA ramps, Treatment is (TBD), Located within Sec 16 & 17, T15S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2023-035 |
Sidewalk Improvement Project Along Greasewood Road from Ironwood Hill Drive to Speedway Boulevard, Includes New 6' Sidewalk, Curb Access Ramps, Sidewalk Scupper and Bus Bays. Located within Sec 4, T14S, R13E, G&SRM, Pima County, Arizona (COT)(Record Document Dated: 06/04/2024) |
|
Yes |
U-2023-036 |
Proposition 411, Package 12 - 2023 Surface Treatment Package B - Harlan Heights, Mitman, Thunderbird Heights, Wilshire Heights, Loma Verde, and Monte Catalina Estates - Includes New Asphalt, Curb, Sidewalk, Speed Humps and ADA ramps, Treatment is Patch & Crackfill, Asphalt Rubber Chip, and Type II Microsurface, Located within Sec 1, 12 & 13, T14S, R14E, and Sec 6, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2023-037 |
Starr Pass Boulevard & Players Club Drive Signing and Pavement Marking Improvements (Striping Plan) - with Players Club Drive from Anklam Road to Starr Pass and Starr Pass from where it transitions from straight to curving roadway west past Players Club Drive - (WSP) |
|
No |
U-2023-038 |
Proposition 411 - Collector Streets Rehab Project - Old Spanish Trail: Broadway Boulevard to Harrison Road -Includes New Asphalt and Multi-Use Path, Treatment of Old Spanish Trail - Broadway Boulevard to Camino Seco & Gallob Road to Harrison Road is Pulverize 9", Scrape 3", Infill/Overlay 3" of PAG 2, PG 76-22 TR+, Treatment of Old Spanish Trail - Camino Seco to Gallob Road is Mill Up To 3", Infill/Overlay 3" of PAG 2, PG 76-22 TR+, Treatment of Multi-Use Path is Full Mill & Replace, 2" PAG 2, PG 76-22 TR+, Located within Sec 15 & 16, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2023-039 |
8th Avenue / 18th Street / Campbell Avenue Bike Boulevard - includes new speed humps, traffic circles, and BikeHAWKs at 8th Avenue & 22nd Street, 8th Avenue & 29th Street, and Forgeus Avenue & 36th Street; Bike Boulevard built are on Convent Avenue from Cushing Street to 18th Street then along 8th Avenue to 38th Street, then on 38th Street from 8th Avenue to 10th Avenue, then on 10th Avenue from 38th Street to 41st Street; 19th Street from Verdugo Avenue to Kroger Lane, then on Kroger Lane to 18th Street, then on 18th Street to Mountain Avenue and transitioning to Warehouse Avenue and on Warehouse Avenue until transitioning to Cherry Avenue and on Cherry Avenue to 21st Street, on 21st Street until transitioning to Campbell Avenue, and then on Campbell Avenue to Fairland Stravenue, on Fairland Stravenue to Forgeus Avenue, on Forgeus Avenue to James Thomas Park; Silverlake Road from Fairland Stravenue to Campbell Avenue, then on Campbell Avenue to Pinal Vista, then on Pinal Vista to Kaibab Vista, then on Kaibab Vista to Country Club Road - end - (Y2K Engineering) |
|
No |
U-2023-040 |
HSIP HAWKS Pedestrian Crossing Projects – Package 1 - at 12th Avenue & District Street, 36th Street & MLK Jr Way, Fort Lowell Raod & Balboa Avenue, Irvington Road & First Avenue (1st), Kolb Road & Rosewood Street, Swan Road Cecelia & Street & Timrod Street, Wetmore Road & Neffson Drive - includes new traffic signal poles and conduit, ADA access ramps, sidewalk, curb, and asphalt - (???) |
|
No |
U-2023-041 |
HSIP HAWKS Pedestrian Crossing Projects – Package 2 - at Speedway Boulevard & Sahuara Avenue, Silverlake Road & Cottonwood Lane - includes new traffic signal poles and conduit, ADA access ramps, sidewalk, curb, and asphalt - (???) |
|
No |
U-2023-042 |
Proposition 411, Package 13 - 2023 Surface Treatment Package C - Santa Rita Park Neighborhood, Casitas Del Sol Estates, Cherry Avenue Neighborhood, Los Ranchitos Subdivisions, and Los Reales Industrial Subdivision - Includes New Asphalt, Curb, Sidewalk, Speed Humps and ADA ramps, Treatment is Santa Rita Park 1: 1/4" Profile Milling (4th Ave), AR Chipseal (HV), CRS-2P Chipseal (LV), Santa Rita Park 2: AR Chipseal (HV), CRS-2P Chipseal (LV), Fog, Casitas Del Sol Estates: Crackfill/Mastic, AR Chipseal and Fog, Cherry Avenue Neighborhood: 1/4" Profile Milling, AR Chipseal (HV), Double PMM, Los Ranchitos Subdivisions: Mastic, AR Chipseal (HV), CRS-2P Chipseal (LV), Los Reales Industrial Subdivision: Crackseal, AR Chipseal (HV), CRS-2P Chipseal (LV), Located within Sec 24 & 34, T14S, R13E, Sec 3, T15S, R13E, Sec 5, 8, 14, T15S, R14E, G&SRM, Pima County, Arizona (COT) |
|
Yes |
U-2023-043 |
Proposition 411 Residential Package 14 - Flowing Wells and Sunset Villa Neighborhoods - Includes New Asphalt, Curb, Sidewalk, Speed Humps and ADA ramps, Treatment is 1.5" Mill/Infill, PAG 2, PG 76-22TR+, Located within Sec 26, T13S, R13E, Sec 26, T14S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-001 |
22nd Street & Irving Avenue BikeHAWK Completion - includes a new ADA Access ramp and segment of sidewalk with acquisition of new ROW - (Kimley>Horn) |
|
No |
U-2024-002 |
Camino Maramonte Driveway and Drainage Spot Improvement Project - includes reconstructed driveway and drainage ditch on the east-side of Camino Miramonte north of Calle Resplandor - (COT) (Record Document Dated: 04/01/2024) |
|
Yes |
U-2024-003 |
Proposition 409 Curb Access Ramp Improvement Project - Ward 1 - includes removal and replacement of Type 1 and Type 2 Curb Access Ramps and a Bullnose along Speedway Boulevard at Greasewood Road, Falcon Ridge Drive, and Silverbell Road Intersections & along Grande Avenue at Speedway Boulevard, Delaware Street, Ontario Street, Huron Street, Saint Clair Street, Erie Street, Niagara Street, Colorado Street, Alameda Street, Franklin Street, Fresno Street, and Estrada Street Intersections (COT) |
|
No |
U-2024-004 |
Proposition 411 Residential Package 15 - Escalante Road from Harrison Road to Road Terminus East of Serena Lane, Treatment is Mill & Replace, 3" of ??PAG 2??, and ADA Ramps at Cindy Lane, Located within Sec 26 & 35, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-005 |
Proposition 411 Residential Package 16 - Limberlost Neighborhood, Treatment is 2" Mill & Replace, PAG 2 PG76-22 TR+, ADA Ramps, and Speed Humps, Located within Sec 24, T13S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-006 |
Proposition 411 Residential Rehab Project of Rodeo Addition, Neighborhood Streets - Thoroughbred Road, Champion Stravenue, Nebraska Street, Olive Street, Dakota Street, Alaska Street, Oregon Street, and Missiondale Road - Treatment is 3" Pulverize in place with Maricopa Edge, and ADA Ramps, Collector Streets - Sixth (6th) Avenue - Treatment is Full Depth (4" Asphalt over 6" AB) Replacement with Drainage Modification to Pavement Profile and New Striping Configuration, Located within Sec 1, T15S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-007 |
Offsite Improvement Plans for Teen Challenge Men's Center 2637 N Oracle Road - at the SW Corner of Kelso Street & Oracle Rd, includes removal and adding of driveways, new curb, and new sidewalk and sidewalk scupper, and GSI areas, on both Kelso St & Oracle Rd. - (Grenier Engineering) |
|
No |
U-2024-008 |
Proposition 411 Residential Package 17 - Civano & Sierra Morado Neighborhoods - Jarod James Place, Sara Scarlet Loop, Hannah Header Place, Emma Court, Creosote Ridge Way, Lunate Lane, Canyon Oak Drive, Braided Wash Drive, Black Falls Drive, Red Sage Street, Peach Bell Place, Sandpiper Run Court, Drexel Road, Marchetti Loop, Morning Shadows Drive, Sunrise Peak Road, English Daisy Lane, White Sage Drive, Civano Boulevard, Metropolitan Drive, Tiger Lily Place, Ladyslipper Place, Native Rose Trail, Jumping Quail Drive, Forest Falls Court, Painted Turtle Lane, Starling Drive, Capercaillie Street, Courland Drive, Swaying Palms Avenue, Salsabila Road, Fiorenza Place, Valley Quail Drive, Meadow Breeze Drive, Willow Shade Place, River Stone Court, Water Poppy Road, Desert Drifter Place, Blue Pearl Court, Jakemp Trail, Realgar Place, Yew Place, Wych Elm Place, Sweet Birch Lane, Cedar Elm Lane, Copper Hills Dr, Bitterroot Court, Deep Sky Drive, Rosebud Drive, Moon Desert Drive, Orchid Cactus Lane, Boxthorn Way, Sanctuary Ridge Lane, Raven Rock Road, Saguaro Sunset Place, Winter Gold Drive, Bryony Lane, Hawks Hollow Court, Treatment is Crackfill and Slurry, Located within Sec 1 & 12, T15S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-009 |
Camino Miramonte Chicanes and Landscape Improvements from 2nd Street to Terra Alta Boulevard - includes GSI water harvesting traffic calming chicanes with new modified curb - (Kimley>Horn) |
|
No |
U-2024-010 |
Proposition 411 Residential Package 18 - Barrio Kroeger & Melo Park Neighborhoods - Santa Cruz Lane, Ochoa Lane, Verdugo Avenue, Kroeger Lane, 18th Street, Green Street, 19th Street, 20th Street, Farmington Road, - Includes Speed Humps, Treatment is 2" Mill & Fill Located within Sec 14, T14S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-011 |
Proposition 411 Residential Package 19 - South Park Neighborhood - Euclid Avenue, Tyndall Avenue, New Street, American Dream Place, Fremont Avenue, Santa Rita Avenue, Mountain Avenue, Highland Avenue, Curtis Avenue, 23rd Street, 24th Street, 25th Street, 26th Street, 27th Street, and 28th Street - Includes New Asphalt, Curb, Sidewalk, and ADA ramps, Treatment is 2"-3" Mill & Fill Located within Sec 19, T14S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-012 |
Proposition 411 Collector Street Package 20 - Players Club Drive & Starr Pass Boulevard - Includes New Asphalt and ADA ramps, Treatment is 3" Mill/Infill, Pag 2, PG 76-22 TR+, Located within Sec 8, 17, 20, T14S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-013 |
Proposition 411 Phase 1, Package 21 - Rita Ranch - Rita Verde, Rancho Antigua, Rancho Antigua 2, Horizons, Sunrise Meadow, Arizona Sunset, Hacienda Del Oro, Diamond Key, Pueblo Estrella, and Desert Crossings Subdivisions - Includes New Asphalt and ADA ramps, Treatment is ???, Located within Sec 22, 23, 26, 27, T14S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2024-014 |
Proposition 411 Phase 1, Package 22 - National City & Arcadia - Missiondale Road, Nebraska Street, Wyoming Street, Iowa Street, Montana Place, Thoroughbred Road, 11th Avenue, Placita Casas Bonitas, Nevada Street, 9th Avenue, Montana Street, Lostan Avenue, Burke Circle, Utah Street, Borrego Street, and Louisiana Street - Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Mill & Replace, PAG Mix 2, PG 76-22 TR+, Located within Sec 1, T15S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2024-015 |
Proposition 411 Phase 1, Package 23 - Racquet Club Village, Winterhaven, La Madera - Farr Street, Fort Lowell Road, Greenlee Place, Greenlee Road, Hardy Place, Kleindale Road, Lind Road, Mckenzie Street, Prince Road, Richards Place, Richards Row, Ross Place, Windsor Street, Anderson Drive, Bentley Avenue, Christmas Place, Country Club Road, Forgeus Avenue, Fox Avenue, Palmer Drive, Stewart Avenue, Treat Circle, La Madera Drive, Monte Vista Drive, Florence Drive, Sylvia Street, Copper Street, Alta Vista Street, Allen Road, Clays Alley, Jackson Avenue, Paseo De Las Canchas, and Tucson Boulevard - Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Mill & Replace, Pag Mix 2, PG 76-22 TR+, Located within Sec 28, 29, 32, T135S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-016 |
Collector Street Repaving and Restriping Program (Striping/Signing Plan Only) - Tucson Boulevard: 6th Street to 22nd Street, Located within Secs 8 & 17, T14S, R14E, G&SRM, Pima County, Arizona (COT) |
|
No |
U-2024-017 |
Proposition 411 Collector Street Package 24 - Tucson Boulevard & Elm Street - Includes New Asphalt, ADA ramps, Raised Crosswalk/Speed Table, Treatment is 3" Mill/Infill, Pag 2, PG 76-22 TR+ (Non-RAP), Located within Sec 5 & 8, T14S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-018 |
Proposition 411 Phase 1, Package 25 - Kennedy Park Estates, San Xavier Addition, and Freedom Homes - Mission Road (Frontage), Calle La Paz, Calle Guadalajara, Calle Acapulco, Veterans Place, San Rafael Place, Ajo Way (Frontage), Freedom Drive, Circle A Drive, Circle B Drive - Includes New Asphalt and ADA ramps, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 27, T14S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2024-019 |
12th Avenue Improvement Project (Offsite/PIA) STA 203+47.63 to 206+69053 at El Guero Canelo - 12th Avenue and Utah Street - includes new curb, ADA ramps, driveways, scupper and sidewalk - () |
|
No |
U-2024-020 |
Offsite paving and striping plans for 34th Street - Santa Cruz Lane to unnamed road to the east - includes widening the road by 5', new curb, sidewalk, scuppers, and ADA ramps, and return at the unnamed road intersection - (EEC) |
|
No |
U-2024-021 |
VOID - VOID - VOID |
|
No |
U-2024-022 |
Proposition 411 Phase 1, Package 27 - Rolling Hills - Rolling Ridge, Estes Park, Arroyo Ridge, 29th Street, Prudence Road, Kenyon Drive, Sarnoff Drive, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Collector Street Treatment is 3" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Local Street Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Alternate Bid Area Local Street Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 16, 20, 21, 22, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
U-2024-023 |
Proposition 411 Phase 1, Package 26 - Amphi Area - Garden Homes, Sawtelle Place, and Pastime Acres - Yavapai Road, Mohave Road, Navajo Road, Estrella Avenue, Incas Avenue, Fontana Avenue, Geronimo Avenue, Los Altos Avenue, 2nd Avenue, Windsor Street, Pastime Road, Knox Drive, Smoot Drive, King Road, Balboa Avenue, Castro Avenue, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 25, T13S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2024-024 |
Proposition 411 Phase 1, Package 28 - Vista Del Rio, The Enclave, and Rancho Perdido Estates - Bronze Place, Camino Del Rio, Camino Montaraz, Desert Arbors Street, Dos Mujeres Road, Golden River Lane, La Cienega Drive, Park View Drive, Pewter Place, Rio Vista Circle, Super Chicken Drive, Desert Links Drive, Desert Pearl Drive, Dos Hombres Road, Essel Drive, La Chiquita Avenue, Rio Verde Drive, Marquise Drive, Hartwick Court, Pearl Court, Hartwick Avenue, Ivory Court, Sedona Court, Cleary Way, Marquise Court, Pantano Road, Camino Bavispe, Camino Perdido, Avenida Empalme, Includes New Asphalt, ADA ramps, Speed Humps, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 32, T13S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2024-025 |
Proposition 411 Phase 1, Package 29 - Altadena Heights - Cherry Street, 25th Street, 27th Street, 28th Street, Warren Avenue, Includes New Asphalt and ADA ramps, Cherry Ave Treatment is 2.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), All Other Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP) Located within Sec 19, T14S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
No |
U-2024-026 |
Proposition 411 Phase 1, Package 30 - Ward 5 - Mortimore Addition, Desert Shadows, Summerfield, Southland Park, Los Ranchitos, Desert View, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is ???, Located within Sec 4, 5, 7, 9, T15S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
No |