U-2018-003 |
The Hub at Tucson Phase III. Located on the SW corner of Speedway Blvd. and Tyndall Ave. Site improvements for new construction. Includes new bus bay on Speedway Bl, improvements to alley between Tyndall Av and Euclid Av, and along the west-side of Tyndall Av - (Grenier) NOTE: Bidset/construction plans. |
|
Yes |
U-2018-004 |
Public paving plans for northwest corner Oracle Rd and Limberlost Dr lots 1-3. Site improvements for new construction. 3 Engineering. |
|
Yes |
U-2018-005 |
VOID - Offsite Improvements for Houghton Town Center Phase 2A. Right turn lane on E Old Vail Rd.
NOTE: NOT BUILT |
|
No |
U-2018-006 |
Road Recovery FY 2019 Rehabilitation Package 1. Includes Starr Pass Boulevard: Lost Starr Drive to approximately 500' west of Mission Road & from Santa Cruz Lane to I-10 Frontage Road; Congress Street: Silverbell Road to Grande Avenue; Speedway Boulevard: Greasewood Road to Painted Hills Road; La Cholla Boulevard: Starr Pass Boulevard to SR 86 (Ajo Way). - Job (S102) - (Kimley - Horn) |
|
Yes |
U-2018-007 |
Offsite improvements for The Trinity mixed-use, NE corner of 4th St. and 4th Av. Cypress Civil Development. |
|
Yes |
U-2018-008 |
Right turn lane, median island modification, multi-use path for Saguaro Trails entrance off Houghton Rd. (EEC) (Record Document Dated: 05/23/2024). |
|
Yes |
U-2018-009 |
Offsite improvement plans for University of Arizona Honors College including portions of: E Adams St., E Drachman St., N Fremont Ave., E Mabel St., N Park Ave., and N Santa Rita Ave., within T.14S., R.14E., Sec. 6, Pima County, Arizona (Rick Engineering). |
|
Yes |
U-2018-010 |
Offsite public paving improvements plans for Tucson Subaru Commercial Storage, Roger Rd approx. 1000 ft west of Oracle Rd (Baker & Associates). |
|
Yes |
U-2018-011 |
Arcadia and Timrod Bicycle Boulevards - Grant Road to Eastland Street and Alvernon Way to Craycroft Road Roadway Improvements - COT Job No. SA12 -- ADOT TRACS No. 0000 PM TUC T0129 01C -- Federal Project No. TAP-TUC-0(264)D -- (PSOMAS)(Record Document Dated: 06/03/2024) |
|
Yes |
U-2018-012 |
-VOID- MLK Jr. Way improvements from 36th St to Tucson Marketplace Bl, within Sec. 30, T.14S., R.14E., G & SRM, new medians, curb and pedestrian facilities (Marum & Associates, LLC). Please see I-2018-0XX. |
|
No |
U-2018-013 |
Offsite Improvement Plan for HSSA (Humane Society of Southern Arizona) Animal Welfare Center, Roger Rd approx. 1200 ft west of Oracle Rd, within Sec. 26, T.13S., R.13E., G & SRM, new sidewalks, ramps, scupper (Cypress Civil Development). |
|
Yes |
U-2018-014 |
Offsite Improvement Plan for Halcyon Acres Block 1 - Driveway along Harrison Road near SW Broadway Boulevard & Harrison Road - (Cypress Civil Development) |
|
Yes |
U-2018-015 |
Houghton Road RTDN Fiber Systems Construction Plans - Houghton Rd. from Irvington Rd. to Valencia Rd. - (Kimley - Horn) (Record Document Dated: 12/30/2020)
NOTE: Electronic Files only.
|
|
Yes |
U-2018-016 |
Treat Ave right-of-way improvements from Florence Dr to Grant Rd including traffic calming devices, street lighting and landscaping. |
|
Yes |
U-2018-017 |
Road Recovery FY 2019 Rehabilitation Package 2, includes - River Rd: 841' E of Oracle Rd to Oracle Rd west P.I.; River Rd: Stone Lp to 1st Ave; Roger Rd: 1st Av to Mountain Av; Roger Rd: Mountain Av to Wilson Av; Runway Dr: Gardner Ln to Prince Rd - COT Job No. S102 (Kimley-Horn). |
|
Yes |
U-2018-018 |
Offsite improvements for Project Cactus, located 775 W Silverlake Rd within Sec. 23, T.14S., R.13E., improvements to existing asphalt, new curbs, sidewalks and landscaping (Hunter Engineering). |
|
Yes |
U-2018-019 |
Signing and Striping, South 12th Avenue from 40th Street to 43rd Street |
|
Yes |
U-2019-001 |
Alley Plan for 1131 North Alley Tucson Boulevard - Chip Seal paving for East - West alley from Tucson Boulevard to Norton Avenue between Speedway Boulevard and Hellen Street [T14S R14E Section 5] (JAS Engineering). |
|
Yes |
U-2019-002 |
Paving and Striping Plans for Texas Instruments - Williams Boulevard. Median modification and new sidewalks and scuppers (EEC). |
|
No |
U-2019-003 |
Tucson Country Club Estates Entry - Public/Private Paving Improvement Plans located within Section 31, T13S, R15E and Section 6, T14S, R15E, G&SRM, Pima County, Arizona (Baker & Assoc.) |
|
No |
U-2019-004 |
Sueno Hermoso Lots 1 - 6, Common Area "A" (Private Street: Calle Sueno Hermoso), Common Area "B" (Detension / Retention) Improvement Plans, Located near Randall Boulevard and Alvord Road (SOLIS). |
|
Yes |
U-2019-005 |
Road Recovery Proposition 101 Rehabilitation Package 4. Includes Los Reales Road: 12th Avenue to Nogales Highway; Los Reales Road: Santa Clara Avenue to 12th Avenue; 6th Avenue: Illinois Street to Irvington Road; 6th Ave: Benson Highway to Ajo Way; Park Avenue: 18th Street to 36th Street; Granada Avenue: St. Mary's Road to Congress Street; Granada Avenue: Davis Street to St. Mary's Road; Main Avenue: Speedway Boulevard to Davis Street. - Job (S102) - (Kimley-Horn) |
|
Yes |
U-2019-006 |
VOID -- VOID -- VOID -- Camino Miramonte from 2nd Street to 5th Street
Signing and Striping Plans |
|
No |
U-2019-007 |
Euclid Avenue and First (1st) Street Roadway Modification for Drainage - COT Plans. |
|
No |
U-2019-008 |
Traffic Signal Modification Plans For: Park Avenue and 2nd (Second) Street - as per Aspire Tucson 2 PIA Project - (Rick Engineering) |
|
Yes |
U-2019-009 |
Civano II (2) - Block 1 Offsite Improvement Plans, modifications to existing sidewalk and Painted Turtle Lane (Ln) for the development of lots to the north of the existing road - (PSOMAS) |
|
No |
U-2019-010 |
Grant Road RTDN Fiber Systems from 15th Street to Freemont Avenue. |
|
Yes |
U-2019-011 |
Road Recovery Proposition 101 Rehabilitation Package 7. Includes Fort Lowell Road: From 260' E of Country Club Road to WPI Alvernon Way; Glenn Street: EPI Alvernon Way to WPI Swan Road; Grant Road: CL Venice Place to 832' E of Beverly Avenue; Grant Road: From 718' E of Craycroft Road to WPI Wilmot Road; Wilmot Road - SPI Grant Road to NPI Pima Street. - Job (S102) - (Kimley-Horn) |
|
Yes |
U-2019-012 |
Offsite Improvement Plan for the Union on 6th - 6th Street, 5th Avenue, Herbert Avenue, and 4th Avenue - includes new pavement, sidewalk, and along 5th Avenue curb bump-outs and angled parking - in T14S, R13E, Sec 12 - (Cypress Civil Development). |
|
No |
U-2019-013 |
Mary Ann Cleveland Way Shared-Use Path Improvement - Houghton Road to Atterbury Wash Way, improvements includes a concrete and asphalt path on the north side of Mary Ann Cleveland Way with header curb and other additional new curb - (PSOMAS)(Record Document Dated: 01/27/2025) |
|
Yes |
U-2019-014 |
Treat Avenue Bicycle Boulevard - Rillito River to Aviation Bikeway, corridor follows neighborhood streets and primarily follows Cactus Boulevard, Treat Avenue, and Bristol Avenue - Includes Curb Bump-Outs, Traffic Circles, and Speed Humps - (PSOMAS) (Record Document Dated: 06/30/2023) |
|
Yes |
U-2019-015 |
Roger Road Pedestrian Safety and Walkability - Complete Sidewalks and Landscaping along both sides of Roger Road - Romero Road to Oracle Road - (PSOMAS) |
|
Yes |
U-2019-016 |
3rd Street/University Bicycle Boulevard - Main Avenue to Wilmot Road, corridor follows neighborhood streets and primarily follows University Boulevard, 3rd Street, and Rosewood Street (Record Document Dated: 07/14/2023) |
|
Yes |
U-2019-017 |
Pedestrian Hawk Crossing (Signal) - Package 1 - 22nd Street and Irving Avenue; Campbell Avenue north of Wyoming Street; 6th Avenue and Ohio Street - Jobs (SH37, SH40, SH41) - (Kimley-Horn) (Record Document Dated: 11/22/2024) |
|
Yes |
U-2019-018 |
Pedestrian Hawk (Crossing) Signal - Package 2 - Pima Street and Mountain View Avenue; Prince Road and Crescent Manor Drive; Alvernon Way and Bellevue Street - Jobs (SH36, SH38 & SH39) - ADOT TRACS Project No. T0259 01C -- Federal Aid Project No. TUC-0(266)D -- (WSP)(Record Document Dated: 5/21/2024) |
|
Yes |
U-2019-019 |
Sunnyside High School - Rectangular Rapid Flashing Beacon (RRFB) on E Bilby Road, 500-feet West of S. Campbell Avenue - (COT) - As-Received -
NOTE: Plans 11" x 17" |
|
Yes |
U-2019-020 |
N Grande Avenue and W Alameda Street Solar Pedestrian Hybrid Beacon (HAWK) - (COT) - As-Received -
NOTE: Plans 11" x 17" |
|
Yes |
U-2020-001 |
Proposition 101 Road Recovery Rehabilitation Package 12. Silverbell Road: Saint Mary's Road to Congress Street - Includes full road rebuild and water main & pipe system replacement, with new ADA ramps - Job (S102) - (Kimley - Horn) (Record Document Dated: 12/30/2024) |
|
Yes |
U-2020-002 |
Proposition 407 Bicycle Boulevards Phase 1A - Michigan Street from Kostka Avenue to 16th Avenue, Michigan Drive from 16th Avenue to Lundy Avenue, Pennsylvania Drive from Lundy Avenue to Fair Avenue, Fair Street from Fair Avenue to Benson Highway; Bantam Road from 1st Avenue to Cassia Way; Bantam Road from Tucson Boulevard to Country Club Road; Cherry Avenue from Bantam Road to Missouri Street thence to Fair Street; Missouri Street from Cherry Avenue to Greenway Drive; Greenway Drive from Missouri Street to Virginia Street, Greenway Drive from Virginia Street to Wedwick Street; Wedwick Street from Greenway Drive to Jasmine Way; Jasmine Way from Wedwick Street to Drexel Road; Calle Alvord from 12th Avenue to 1st Avenue; construction includes speed tables, curb bump outs, traffic circles, and HAWK crossings - (Kimly-Horn) (Record Document Dated: 06/22/2023) |
|
Yes |
U-2020-003 |
STRIPING AND PAYEMENT MARKING PLANS, OFFSITE IMPROVEMENT PLAN FOR 6455 SOUTH WILMOT ROAD AND EAST LITTLETOWN ROAD - T15, R15, SECTION 7, CYPRESS CIVIL |
|
No |
U-2020-004 |
Fire Station OPS Fiber System Upgrade - new overhead fiber from Valencia Road south along Alvernon Way to Tucson Fire Station #22 at 6810 South; new overhead fiber with 150-feet of coil at Southwest corner of Wilmot Road and across Valencia Road - (Kimley-Horn) |
|
No |
U-2020-005 |
Hub on Campus Park Avenue - Public Improvements - including new pavement and curb returns, sidewalk, and ADA ramps on the alley south of Speedway Boulevard and between Tyndall Avenue and Park Avenue - (Grenler Engineering Inc.) |
|
No |
U-2020-006 |
Maingate Phase V (5) Mixed Used - Private Improvements - including new pavement and curb bumpout, curb returns, sidewalk, and ADA ramps on south-side of 2nd Street between vacated alley and Park Avenue - alley originally between Tyndall Avenue and Park Avenue - (Grenier Engineering Inc.) |
|
No |
U-2020-007 |
Project Wildcat at Century Park - Offsite Traffic Signal Improvement Plans for Kold Road - at intersections Kolb Road & Littletown Road and Kold Road & Century Park Drive - (Rick Engineering). NOTE: Electronic Plans Only from Pima County. |
n/a |
Yes |
U-2020-008 |
Hub on Campus Park Avenue Public Improvements - on north-south alley between Parks Avenue and Tyndall Avenue south of Speedway Boulevard - includes new curb returns, pavement, and ramps - (Grenier Engineering Inc.) |
|
No |
U-2020-009 |
Offsite Improvement Plan for The Bridges Sub-Area B-III - New turn lanes, curb, returns, ramps, asphalt mulit-use path at new private road entrance to Kino Boulevard south of Tucson Market Place Boulevard - (Cypress Civil) |
|
Yes |
U-2020-010 |
Offsite Improvement Plan for Thoroughbred Nissan at 22nd Street and Rosemont Avenue - New sidewalk and ramps, and new curb and returns at new business road entrances to 22nd Street east of Rosemont Avenue and the elimination of several existing business entrances - new curb, sidewalk, scuppers, ramps and returns on Rosemont Avenue south of 22nd Street and a new business road entrance - (Cypress Civil) |
|
No |
U-2020-011 |
Offsite Improvement Plans for Project LTS Tucson Campus 2021 - New business turn lane that includes asphalt, valley gutter, street light, relocated fire hydrant, sidewalk and ramps, and new curb and returns - off Golf Links Road between Hearthstone Drive and Harrison Road - (Hunter Engineering). |
|
No |
U-2020-012 |
Bicycle Boulevard Pavement Resurfacing Package 1 - micro-milling and asphalt replacement over the Proposition 407 Bicycle Boulevards Phase 1A route (see plan U-2020-002) - (Kimley>Horn) |
|
No |
U-2020-013 |
Pedestrian / Bike HAWK Signal - Grant Road at Arcadia Avenue - COT Job (SH31) - (Stantec)
NOTE: Location Description is incorrect and should read SW 1/4 Section 35, T-13-S, R-14-E & NW 1/4 Section 02, T-14-S, R-14-E. (incorrect township recorded on plan) |
|
No |