| U-2025-001 |
Mission Road & Via Ingresso Traffic Signals - (Rick)(NOTE: Plans "AS RECEIVED" 1/10/2025) |
|
Yes |
| U-2025-002 |
Proposition 411 Collector Street Package 35 - Calle Santa Cruz: Irvington Road to Valencia Road - Includes New Asphalt, sidewlaks, and ADA ramps, Treatment is Mill & Replace, PAG Mix 2, PG 76-22 TR+, Located within Sec 2, T15S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-003 |
HSIP Flashing Yellow Arrows & Backplates - at Broadway Boulevard & Houghton Road, Fifth (5th) Street & Wilmot Road, Golf Links Road & Craycroft Raod, Grant Road & First (1st) Avenue, Grant Road & Oracle Road, Irvington Road & Houghton Road, Speedway Boulevard & Alvernon Way, Speedway Boulevard & Prudence Road, St. Mary’s Road & Granada Avenue, Tanque Verde Road & Houghton Road, Tanque Verde Road /Paseo Rancho Esperanza, Valencia Road & Palo Verde Road - (PSOMAS) |
|
No |
| U-2025-004 |
HSIP Flashing Yellow Arrows, Backplates and Lenses - 22nd Street & Sixth (6th) Avenue, Ajo Way & Forgeus Avenue, Ajo Way & La Cholla Boulevard, Ajo Way & Sixth (6th) Avenue, Broadway Boulevard & Craycroft Road, Golf Links Road & Harrison Road, Grant Raod & Forbes Boulevard, Grant Road & Wilmot Road, Irvington Road & Kolb Road, Old Spanish Trail & Harrison Road, Prince Road & Fairview Avenue, River Road & Campbell Avenue - (PSOMAS) |
|
No |
| U-2025-005 |
HSIP Intersection Improvements, Flashing Yellow Arrows - 29th Street & Craycroft Road, 29th Street & Swan Road, Auto Mall Drive & Oracle Road, Ft. Lowell Road & Dodge Boulevard, Golf Links Road & Swan Road, Grant Road & Swan Road, River Road & Hacienda del Sol, Roger Road & Flowing Wells Road, Valencia Road & Santa Clara Avenue, Via Ingresso & Mission Road, Wrightstown Road & Pantano Road - (Kimley>Horn) |
|
No |
| U-2025-006 |
HSIP Intersection Improvements, Positive Offset and Flashing Yellow Arrows - at Broadway Boulevard & Jessica Avenue, Drexel Road & Tucson Boulevard, Grant Road & Fairview Avenue, Irvington Road & Mission Road - (Kimley>Horn) |
|
No |
| U-2025-007 |
Striping Plan - 6th Avenue from Drexel Road to Valencia Road T15S, R13E, Section 12 (City of Tucson, Traffic Engineering)(Record Document Dated: 08/13/25) |
|
Yes |
| U-2025-008 |
Proposition 411, Package 36 - 2025 Surface Treatment Package A - Butterfield Ranch, Summit Park, Manana Grande, Concord Hill, Vista Del Sierras, and Rolling Hills Vista Neighborhoods - Curb, Sidewalk, and ADA ramps, (Treatment is Chip Seal & Slurry Seal to be Completed by Future Construction), Located within Sec 20 & 21, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-009 |
Houghton Road and Mary Ann Cleveland Way Ramp and Guardrail Improvements - Including New Access Ramps at the SE Corner of Houghton Rd & Mary Ann Cleveland Way with New MUP and Sidewalk tie-in, and also New Guardrail at MAC Way & Atterbury Wash Way (SW Corner) and MAC Way & Steve Street (SW Corner) - (Kimley>Horn) |
|
No |
| U-2025-010 |
Western Hills Neighborhood Revitalization Project - ADOT TRACS No. T0466 - Federal Project ID TUC0275 - Includes Mill and Replacement of Asphalt, New Raised Speed Table Crossing Walk, Replacement of Speed Tables & Humps, New Sidewalk, and New Access Ramps - (Kimley>Horn) |
|
No |
| U-2025-011 |
Proposition 411, Package 37 - Valley View & Sutton Place, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 29, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-012 |
Proposition 411 Phase 1, Package 38 - Ward 4 - Pine Grove, Palm Grove Clusters, Olive Grove, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 32, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-013 |
Proposition 411 - Collector Streets Rehab Project - Park Avenue: Fort Lowell Road to 2nd Street - Includes New Asphalt and Curb Access Ramps, Park Ave Treatment from Fort Lowell Rd to Adams Street & Park Ave from Speedway Boulevard to 2nd Street is 3" Asphalt Plane/Mill & Replacement, PAG Mix 2, PG 76-22 TR+, Non-RAP, Park Avenue Treatment from Adams Street to Speedway Boulevard is Micro-Surfacing, Aggregate Type II, CQS-1HP w/ 4% SBS Polymer (MSE), Located within Sec 31, T13S, R14E, Sec 6 & 7, T14S, R14E G&SRM, Pima County, Arizona - (COT)(Record Document Dated: 11/07/2025) |
|
Yes |
| U-2025-014 |
Park Avenue Pavement Marking Project - from Fort Lowell Road to Speedway Boulevard - (Kimley > Horn) |
|
No |
| U-2025-015 |
Proposition 411, Package 39 - Surface Treatment Package B - Glen Heather, Manana Vista, & Miramonte Neighborhoods, Treatment is Micro-Milling, Crack Filling and Patching, AR Chip with Heavy Type III Slurry and Type II Slurry. Located within Sec 18, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-016 |
Proposition 411, Phase 1, Package 40 - Saddlewood Ranch, Enchanted Hill, Oak Park, New Curb Access Ramps Only, Located within Sec 4 & 27, T14S, R13E, Sec 3 & 10, T15S, R13E, G&SRM, Pima County, Arizona - (COT)(Record Document Dated: 11/17/2025) |
|
Yes |
| U-2025-017 |
Kenyon Drive and Sarnoff Drive Enhanced Bicycle & Pedestrian Safety with Speed Calming Signing and Marking Improvement plans - on Kenyon Drive between Pantano Road and Old Spanish Trail and on Sarnoff Drive between Broadway Boulevard and Pantano Parkway - includes new speed tables, center curbed pedestrian refuge, flexible plastic bollards, modular speed humps, enhanced striping and markings - (Kimley>Horn) |
|
Yes |
| U-2025-018 |
Proposition 411 - Phase 1, Package 41 - Menlo Park, Tucson Park West, and Sentinel Peak Rd, Includes New Asphalt, ADA ramps, Speed Humps, and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 8, 9, 10, 14, 15, 16, and 17, T14S, R13E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-019 |
Proposition 411 - Package 42 - San Juan Trail from Greasewood Road to Mission Road and Greasewood Road from Starr Pass Boulevard to End of Road South of San Juan Trail, Includes New Asphalt, ADA ramps, and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 21 & 22, T14S, R13E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-020 |
Proposition 411 - Package 43 - Ward 5 - Buckners Addition, Altadena Heights, Mirasol Addition, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 18, 19, & 20, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-021 |
Proposition 411 - Package 44 - Flowing Wells Village & Flowing Wells Park, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 26, 27, & 34, T13S, R13E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-022 |
Proposition 411 - Package 45 - Harrison Hills & Mountain Shadows, Includes New Asphalt and ADA ramps, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 26, T14S, R15E, G&SRM, Pima County, Arizona - (COT)(Record Document Dated: 11/07/2025) |
|
Yes |
| U-2025-023 |
Proposition 411 - Package 46 - American Villa & Country Club Manor, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 17 & 18, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-024 |
Proposition 411 - Package 47 - C.O.T. Military Plaza, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 12 & 13, T14S, R13E, and Sec 18, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-025 |
Proposition 411 - Package 48 - C.O.T. Resub, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 7, T14S, R14E, and Sec 12, T14S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-026 |
Proposition 411 - Package 49 - Glen Heather Estates & Miramonte Terrace, Includes New Asphalt, ADA ramps, Speed Humps & Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 18, T14S, R15E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-027 |
Proposition 411 - Package 50 - Lamar City Acres, National City Annex, and Valley Indian Agency Connect Road , Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 35, T14S, R13E, and Sec 15, T15S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-028 |
Proposition 411 - Package 51 - San Paulo Neighborhood , Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 24, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-029 |
Proposition 411 - Package 52 - Windsor Park, Verde Vista, Cochise Estates, Kingston Knolls Terrace , Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 3, 5, and 8, T14S, R15E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-030 |
Proposition 411 - Package 53 - Frontier Village & Columbus Addition, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 3, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-031 |
Starr Pass Boulevard & Players Club Drive Safety Improvements - Starr Pass Bl from terminus at resort east to Lost Starr Drive and Players Club Dr from Starr Pass Bl to Anklam Road - includes new sidewalk, scuppers, concrete barrier, guardrail, and speed tables - (WSP) |
|
No |
| U-2025-032 |
Proposition 411 - Phase 1 - Package 54 - Hearthstone Hills, Pace East, Ridgeland Park, and Rancho Del Rincon, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 3, T14S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-033 |
Proposition 411 - Phase 1 - Package 55 - Farmington Addition, Grantland Acres, and La Madera Addition, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 32 & 33, T13S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-034 |
Proposition 411 - Package 56 - West University Neighborhood, Includes New Asphalt, ADA ramps, Speed Humps, and Sidewalk, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 12, T14S, R13E, and Sec 7, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-035 |
Columbus Boulevard Sidewalk and Striping Plans from Fort Lowell Road to Broadway Boulevard - (PSOMAS) |
|
No |
| U-2025-036 |
Proposition 411 - Package 57 - Mission Manor III, Includes New Asphalt, ADA ramps, Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 12, T15S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-037 |
Wetmore Road and 4th (Fourth) Avenue High-Intensity Activated Crosswalk (HAWK) - includes new Curb, Sidewalk, Access Ramps and HAWK Traffic Lights - (Kimley>Horn) |
|
No |
| U-2025-038 |
El Paso and Southwestern Greenway -- St. Mary's Road to Cushing Street - Job No. 181820-04 - (ECE) |
|
No |
| U-2025-039 |
Ajo Way Sidewalk Improvement Plans from 6th Avenue to 16th Avenue - includes new Sidewalk and ADA Ramps - (ISX) |
|
No |
| U-2025-040 |
6th Avenue Protected Bike Lanes from Speedway Boulevard to 7th Street - includes new Speed Tables, Precast Concrete Bike Curbs, Soft Hit Posts, and Striping - (WSP) |
|
No |
| U-2025-041 |
Striping Plan - Anklam Road from St. Marys Road to Silverbell Road,T14S, R13E, Section 10 (City of Tucson, Traffic Engineering) |
|
Yes |
| U-2025-042 |
Proposition 411, Spring 2025 Curb Ramp Package C, Package 58 - Desert Steppes, Sherwood Village Terrace North, and Sherwood Village Terrace South, New Curb Access Ramps Only, Located within Sec 16, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
No |
| U-2025-043 |
Mill & Fill with Realigned Pavement Marking Plan - San Juan Trail from La Cholla Boulevard to Mission Road - includes 3" mill and replacement of new asphalt (PAG 2) and re-striping to reduce travel lanes to 10' and adding to 6.5' bike lanes with parallel parking on south-side - (COT) |
|
Yes |
| U-2025-044 |
Pavement Improvement Plans at 35th Street east of Euclid Avenue Intersection - Pavement Reconstruction to Address Drainage Issues - (WSP) |
|
No |
| U-2025-045 |
New Traffic Signal Lights at Tucson Market Place Boulevard & Martin Luther King Jr. Way Intersection Improvements - includes new poles, conduit, and some sidewalk modification - (Kittelson) |
|
No |
| U-2025-046 |
Proposition 411 Package 59 - Tucson Heights and Highland Park Addition, Includes New Asphalt, ADA ramps, Speed Humps, and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 1, T14S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-047 |
Repaving and Restriping plans Roger Road from Pomona Road to Flowing Wells Road and Fairview Avenue to Oracle Road - includes 3" mill and replacement of asphalt and change of striping - (PSOMAS) |
|
No |
| U-2025-048 |
Sahuara Avenue and Copper-Flower Bicycle Boulevards – includes new Bike HAWK crossings, conversion of existing HAWKs to Bike HAWKs, new traffic calming devices (speed humps, traffic circles, chicanes), pavement markings, wayfinding, and enhanced bicycle connection facilities for both routes – (PSOMAS). ADOT TRACS No. T0485; Federal Project No. TUC-0(279)D. |
|
No |
| U-2025-049 |
Proposition 411 Package 60 - Amphitheater Acres Addition, Includes New Asphalt, ADA ramps, and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 19, T13S, R14E & Sec 25, T13S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-050 |
Proposition 411 Package 61 - El Encanto Estates, Includes New Asphalt and ADA ramps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 9, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |