| R-2006-001 |
Houghton Road - From Speedway Boulevard To Tanque Verde Road, Right Of Way Plans Obtained By Pima County, Project Work Order Number 4BHTVC - from PC DOT & Flood Control District 7-19-1988 |
|
Yes |
| R-2006-002 |
Oracle Road/Main Avenue/Drachman Street Intersection Improvements Right-of-Way Plans |
158 |
Yes |
| R-2006-003 |
Speedway Boulevard/Main Avenue Intersection Improvements Right-of-Way Plans |
159 |
Yes |
| R-2007-001 |
--Not Recorded Version of Record of Survey--See Record of Survey Book 69, Pge 29--, For Houghton Road From Twenty Second Street to Valencia Road, Monument Study, Located North Of Valencia Road, South Of 22nd Street, East Of Kolb Road, West Of Houghton Road, Within Sections 23, 24, 25, 26, 35 And 36, T14S, R15E, And Sections 1, 2, 11, 12, 13 And 14, T15S, R15E, Gila And Salt River Meridian, Pima County, Arizona. NOTE: Plan is incorrectly labeled, plan number should be R-2007-001 and not I-2007-001 --Not Recorded Version of Record of Survey--See Record of Survey Book 69, Pge 29-- |
160 |
Yes |
| R-2008-000 |
- 2008 - Class ''R'' - RIGHT-OF-WAY: Streets, Highways, Alleys, Widening, Drainage, Sewers Drawings. - 2008 - |
- 2008 - |
No |
| R-2008-001 |
Grant Road - Oracle Road to Swan Road -- (Ashby), Reference Record Of Survey, Book 64, Page 69 -- RS-64-069, Amended portion (Oracle to 1st Ave) Sequence #20132560710 |
|
Yes |
| R-2008-002 |
Houghton Road, from Speedway Boulevard to 29th Street, right-of-way (Urban Eng.) |
|
No |
| R-2009-000 |
- 2009 - Class ''R'' - RIGHT-OF-WAY: Streets, Highways, Alleys, Widening, Drainage, Sewers Drawings. - 2009 - |
- 2009 - |
No |
| R-2009-001 |
Stone Avenue Right-of-Way, from Grant Road to Drachman Street (Urban Eng.) |
161 |
Yes |
| R-2009-002 |
State of Arizona Department Of Transportation (ADOT) -- Right of way plan of the Casa Grande-Tucson Highway south yard drill track -- 10 PM 257 H3188 03R -- NH-10-4(144) -- I-10 (I10) Highway, Saint Mary's Road to 22nd Street |
|
Yes |
| R-2010-000 |
- 2010 - Class 'R' - RIGHT-OF-WAY: Streets, Highways, Alleys, Widening, Drainage, Sewers Drawings. - 2010 - |
- 2010 - |
No |
| R-2010-001 |
Downtown Links -- Saint Mary's Segment -- Survey and Right of Way to be acquired -- Sequence #20121670705 (HDR) -- ALSO ROW Plan for 8th Street Drainage -- Sequence #20120120180 |
|
Yes |
| R-2010-002 |
Houghton Road, Irvington Road to Valencia Road -- Record of Survey and Right-of-Way Study -- T14S, R15E, Sections 35, and 36. and T15S, R15S, Sections 1, 2, 11, 12,13, and 14 -- (Psomas) -- Reference Plan I-2009-004 |
|
No |
| R-2010-003 |
Starr Pass Boulevard and Mission Road Right-Of-Way Plans, T14S, R13E, Sections 14, 15, 22 & 23. (Urban Engineering) |
164 |
Yes |
| R-2010-004 |
Tucson Modern Streetcar -- Horizontal Control T14S, R13E, Sections 12, 13 & 14 AND T14S, R14E, Sections 6 & 7, Sequence #20120120179; Lots 14, 15 & Common Area 'C' of Amended Final Plat for Rio Nuevo M&P Bk 57 at Pg 40, Sequence #20120480898; Lots 2, 3, 6, 7, and the west 115' of Lots 10 & 11 of Block 42 of City of Tucson M&P Bk 2 at Pg 4, Sequence #20120760725; Traction Power Sub-Station (TPSS) A1, r/w to be acquired, Sequence #20120480897; Lots 1, 5 & 6 of Block 510 of Pueblo Center Redevelopment Project M&P Bk 20 at Pg 83, Sequence #20120760724; TPSS A1 (revised), Sequence #20121320700 (HDR); TPSS A-2, Sequence #20130460918. |
|
Yes |
| R-2010-005 |
22ND STREET & KINO PARKWAY RIGHT-OF-WAY ACQUISITIONS WITHIN SECTIONS 18 & 19, TOWNSHIP 14 SOUTH, RANGE 14 EAST, GILA & SALT RIVER MERIDIAN, PIMA COUNTY, ARIZONA (PSOMAS), Reference Sequence Number 20111540567 |
|
Yes |
| R-2011-000 |
- 2011 - Class 'R' - RIGHT-OF-WAY: Streets, Highways, Alleys, Widening, Drainage, Sewers Drawings. - 2011 - |
- 2011 - |
No |
| R-2011-001 |
Houghton Road / Broadway Boulevard Intersection Right-of-Way, T14S, R15E, Sections 11, 12, 13 &14 (Urban Eng.). |
|
No |
| R-2012-000 |
- 2012 - Class 'R' - RIGHT-OF-WAY: Streets, Highways, Alleys, Widening, Drainage, Sewers Drawings. - 2012 - |
- 2012 - |
No |
| R-2012-001 |
Houghton Road, Irvington Road to Valencia Road -- Depiction of State Rights-of-Way -- T14S, R15E, Sections 35, and 36. and T15S, R15S, Sections 1, 2, 11, 12,13, 14, 23 & 24 -- (PSOMAS) |
|
No |
| R-2013-000 |
- 2013 - Class 'R' - RIGHT-OF-WAY: Streets, Highways, Alleys, Widening, Drainage, Sewers Drawings. - 2013 - |
- 2013 - |
No |
| R-2013-001 |
Tanque Verde Road - Pima Street- Wilmot Road Improvement Project Right of Way Plan |
|
No |
| R-2014-000 |
- 2014 - Class 'R' - RIGHT-OF-WAY: Streets, Highways, Alleys, Widening, Drainage, Sewers Drawings. - 2014 - |
- 2014 - |
No |
| R-2014-001 |
Houghton Road: Broadway Boulevard to 29th Street (Urban Eng) |
|
Yes |
| R-2014-002 |
Downtown Links Phase 3: 6th Avenue Underpass to Broadway Boulevard [Construction Project Length] - Right-of-Way study from Main Avenue along route to Barazza-Aviation Parkway & then along parkway to the Park Avenue alignment - (HDR) Seq.# 20172690731 |
|
Yes |
| R-2014-003 |
Downtown Intermodal Center, located at Toole Avenue/Pennington Street/6th Avenue, Sections 12 & 13, T14S, R13E (Urban) |
|
Yes |
| R-2014-004 |
Grant Road Corridor Study, Right of Way Plan, Oracle Road to Swan Road - For Major Streets and Routes. |
|
Yes |
| R-2014-005 |
Right of Way Plans of the Nogales - Tucson Highway - Ajo Way T.I. (JCT. SR 86) - Interstate 19 from Milepost 60 to Milepost 63 (Approx. Irvington Road to N Section Line of Sec 26, T14S, R13E) NOTE: Records transferred to COT by ADOT as electronic copies only, see ADOT for originals. |
|
Yes |
| R-2015-001 |
Broadway Boulevard - Euclid Avenue to Country Club Road - Right-of-Way Plans, within T. 14S., R.14E., Sec. 7, 8, 9, 16, 17, and 18 G. &S.R.M., Pima County, Arizona (HDR). These plans represent the Specific Engineering Plans (SP) referred to by the City of Tucson's Major Streets and Routes (MS & R) planning document. |
|
Yes |
| R-2015-002 |
Broadway Boulevard - Euclid Avenue to Country Club Road, Survey and Right-of-Way Plans, within Sections 7, 8, 9, 16, 17 & 18, T14S, R14E, G. & S.R.M., Pima County, Arizona (HDR). For additional information, please refer to R-2015-001. |
|
Yes |
| R-2015-003 |
Grant Road: Palo Verde Blvd to Venice Pl, Right-of-way, T13S, R14E, Sections 33 & 34 AND T14S, R14E, Sections 3 & 4 (HDR) |
|
Yes |
| R-2016-001 |
Houghton Road - Tanque Verde to Snyder Road r/w drawing, pcdot 1959. |
|
Yes |
| R-2017-001 |
Record of Survey for RTA Bus Pullout Package No. 17, Prince Road, from Romero Road to Campbell Avenue, T13S, R13E, Sections 25, 26 & 27 AND T13S, R14E, Sections 29 & 30, G&SRM (Same as H-2016-023) (Psomas) |
|
No |
| R-2017-002 |
HOUGHTON ROAD - UNION PACIFIC RAILROAD TO INTERSTATE 10, RIGHT OF WAY PLAN |
|
Yes |
| R-2017-003 |
Broadway Blvd. - Camino Seco to Houghton Road, right of way survey |
|
No |
| R-2017-004 |
Record of Survey and Right of Way Plan, Houghton Road - Union Pacific Railroad to Interstate 10 |
|
No |
| R-2017-005 |
Monument Study & Record of Survey Grant Road at the UPRR Underpass within Section 35, T13S, R13E & Section 2, T14S, R13E, G&SRM, Pima County, Arizona |
|
Yes |
| R-2017-006 |
Broadway Blvd. - Euclid Avenue to Country Club Road, Right-of-Way, T.14S., R.14E., Sections 7, 8, 9, 16, 17 & 18 G. & S.R.M. (HDR), Pima County, Arizona. Seq: 20172640601. For additional information, please see R-2015-001. |
|
Yes |
| R-2018-001 |
Right-of-Way plans for the Valencia Rd- Wilmot Rd to east of Kolb Rd, Paving Improvement Project (reference I-2015-014). |
|
Yes |
| R-2018-002 |
Right-of-Way Plans for Grant Road from Stone Avenue to Park Avenue including portions of Section 36, T.13S., R.13E.; Section 31, T.13S., R.14E.; Section 1, T.14S., R.13E.; Section 6, T.14S., R.14E.; G & SRM, Pima County, Arizona (Psomas). Seq. 20162710661. Reference I-2013-009 and H-2016-026. |
|
Yes |
| R-2018-003 |
Right-of-Way Plan and Record of Survey for Silverbell Road from El Camino to Goret Road - including portions of Sections 17, 18, 20, 28, 29 & 33 T.13S., R.13E..; G & SRM, Pima County, Arizona (PSOMAS). Seq. 20192400564. Reference I-2016-002 and R-2018-003, H-2018-011. |
|
Yes |
| R-2018-004 |
Right-of-way plans for Houghton Rd from Valencia Rd to Mary Ann Cleveland Way, including portions of Sections 23, 24, 25, 26, 35 & 36, T.15S., R.15E., G & SRM, Pima County, Arizona (PSOMAS). Reference COT Job No. SR1H and COT Plan No. I-2017-013. |
|
Yes |
| R-2019-001 |
State of Arizona Department Of Transportation (ADOT) -- Right of way plan of the Tucson - Benson Highway at Houghton Road -- 010 PM 275 H8887 -- 010-E(221)T -- NOTE: REDUCED PAPER COPY |
|
Yes |
| R-2020-001 |
Right-of-Way & Record of Survey for proposed bus pullouts/Package number 16 along Stone Avenue located within Sections 25 & 36, Township 13 South, Range 13 East, G&SRM, Pima County, Arizona (PSOMAS) |
|
No |
| R-2020-002 |
Right-of-Way Survey for Roger Road - Romero Road to Oracle Road - for Roger Road - Romero Road to Oracle Road Pedestrian Safety and Walkability Improvement project (U-2019-015) - (PSOMAS) |
|
Yes |
| R-2021-001 |
Record of Survey & Right-of-Way Map for Valencia Road - Alvernon Way to Wilmot Road , A Portion of Sections 10, 11, 12, 13, 14, & 15, T15S, R14E and Section 7, T15S, R15E, G&SRM, Pima County, Arizona (PSOMAS) NOTE: Records transferred to COT by Pima County as electronic copies only, see Pima County for originals. See Also Seq #20131680146 and H-2021-002 |
|
Yes |
| R-2021-002 |
Valencia Road: Kolb Road to Houghton Road (ROW Plans For Project I-2020-021 & COT Job Number SR14) - (PSOMAS) |
|
Yes |
| R-2021-003 |
Grant Road Phases 5 & 6: Fremont Avenue to Parkman Avenue (COT Job Number SR2A) (PSOMAS) |
|
No |
| R-2021-004 |
Right of Way Plans for Houghton Road from 22nd Street to Irvington Road, a Portion of Sections 23, 24, 25, 26, 35, and 36, T.14S., R.15E., G & SRM, Pima County, Arizona - (PSOMAS). Reference COT Job No. SR1J and H-2021-012 for COT project Plan No. I-2016-014. |
|
No |
| R-2023-001 |
Right of Way Plans for Valencia Road from Mission Road to Interstate 19 (I-19), Within Sections 9, 10, 11, 14, 15 & 16, T15S, R13E, G&SRM, Pima County, Arizona (Urban Engineering), COT Plan No. I-2006-077
NOTE: Pima County Project (4VRMRI) in City of Tucson Limits
NOTE: Electronic Copy of Plans Only (See Pima County for Originals)
NOTE: Plan Page Sizes vary from 46.73 x 30.85 in to 35.30 x 22.15 in |
|
Yes |