| U-2025-010 |
Western Hills Neighborhood Revitalization Project - ADOT TRACS No. T0466 - Federal Project ID TUC0275 - Includes Mill and Replacement of Asphalt, New Raised Speed Table Crossing Walk, Replacement of Speed Tables & Humps, New Sidewalk, and New Access Ramps - (Kimley>Horn) |
|
No |
| U-2025-011 |
Proposition 411, Package 37 - Valley View & Sutton Place, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 29, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-012 |
Proposition 411 Phase 1, Package 38 - Ward 4 - Pine Grove, Palm Grove Clusters, Olive Grove, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 32, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-013 |
Proposition 411 - Collector Streets Rehab Project - Park Avenue: Fort Lowell Road to 2nd Street - Includes New Asphalt and Curb Access Ramps, Park Ave Treatment from Fort Lowell Rd to Adams Street & Park Ave from Speedway Boulevard to 2nd Street is 3" Asphalt Plane/Mill & Replacement, PAG Mix 2, PG 76-22 TR+, Non-RAP, Park Avenue Treatment from Adams Street to Speedway Boulevard is Micro-Surfacing, Aggregate Type II, CQS-1HP w/ 4% SBS Polymer (MSE), Located within Sec 31, T13S, R14E, Sec 6 & 7, T14S, R14E G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-014 |
Park Avenue Pavement Marking Project - from Fort Lowell Road to Speedway Boulevard - (Kimley > Horn) |
|
No |
| U-2025-015 |
Proposition 411, Package 39 - Surface Treatment Package B - Glen Heather, Manana Vista, & Miramonte Neighborhoods, Treatment is Micro-Milling, Crack Filling and Patching, AR Chip with Heavy Type III Slurry and Type II Slurry. Located within Sec 18, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-016 |
Proposition 411, Phase 1, Package 40 - Saddlewood Ranch, Enchanted Hill, Oak Park, New Curb Access Ramps Only, Located within Sec 4 & 27, T14S, R13E, Sec 3 & 10, T15S, R13E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-017 |
Kenyon Drive and Sarnoff Drive Enhanced Bicycle & Pedestrian Safety with Speed Calming Signing and Marking Improvement plans - on Kenyon Drive between Pantano Road and Old Spanish Trail and on Sarnoff Drive between Broadway Boulevard and Pantano Parkway - includes new speed tables, center curbed pedestrian refuge, flexible plastic bollards, modular speed humps, enhanced striping and markings - (Kimley>Horn) |
|
Yes |
| U-2025-018 |
Proposition 411 - Phase 1, Package 41 - Menlo Park, Tucson Park West, and Sentinel Peak Rd, Includes New Asphalt, ADA ramps, Speed Humps, and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 8, 9, 10, 14, 15, 16, and 17, T14S, R13E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-019 |
Proposition 411 - Package 42 - San Juan Trail from Greasewood Road to Mission Road and Greasewood Road from Starr Pass Boulevard to End of Road South of San Juan Trail, Includes New Asphalt, ADA ramps, and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 21 & 22, T14S, R13E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-020 |
Proposition 411 - Package 43 - Ward 5 - Buckners Addition, Altadena Heights, Mirasol Addition, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 18, 19, & 20, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-021 |
Proposition 411 - Package 44 - Flowing Wells Village & Flowing Wells Park, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 26, 27, & 34, T13S, R13E, G&SRM, Pima County, Arizona - (Kimley-Horn) |
|
No |
| U-2025-022 |
Proposition 411 - Package 45 - Harrison Hills & Mountain Shadows, Includes New Asphalt and ADA ramps, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 26, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-023 |
Proposition 411 - Package 46 - American Villa & Country Club Manor, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 17 & 18, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-024 |
Proposition 411 - Package 47 - C.O.T. Military Plaza, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 12 & 13, T14S, R13E, and Sec 18, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-025 |
Proposition 411 - Package 48 - C.O.T. Resub, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 7, T14S, R14E, and Sec 12, T14S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-026 |
Proposition 411 - Package 49 - Glen Heather Estates & Miramonte Terrace, Includes New Asphalt, ADA ramps, Speed Humps & Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 18, T14S, R15E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-027 |
Proposition 411 - Package 50 - Lamar City Acres, National City Annex, and Valley Indian Agency Connect Road , Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 35, T14S, R13E, and Sec 15, T15S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-028 |
Proposition 411 - Package 51 - San Paulo Neighborhood , Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 24, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-029 |
Proposition 411 - Package 52 - Windsor Park, Verde Vista, Cochise Estates, Kingston Knolls Terrace , Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 3, 5, and 8, T14S, R15E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-030 |
Proposition 411 - Package 53 - Frontier Village & Columbus Addition, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 3, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-031 |
Starr Pass Boulevard & Players Club Drive Safety Improvements - Starr Pass Bl from terminus at resort east to Lost Starr Drive and Players Club Dr from Starr Pass Bl to Anklam Road - includes new sidewalk, scuppers, concrete barrier, guardrail, and speed tables - (WSP) |
|
No |
| U-2025-032 |
Proposition 411 - Phase 1 - Package 54 - Hearthstone Hills, Pace East, Ridgeland Park, and Rancho Del Rincon, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 3, T14S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-033 |
Proposition 411 - Phase 1 - Package 55 - Farmington Addition, Grantland Acres, and La Madera Addition, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 32 & 33, T13S, R14E, G&SRM, Pima County, Arizona - (COT) |
|
Yes |
| U-2025-034 |
Proposition 411 - Package 56 - West University Neighborhood, Includes New Asphalt, ADA ramps, Speed Humps, and Sidewalk, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 12, T14S, R13E, and Sec 7, T14S, R14E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-035 |
Columbus Boulevard Sidewalk and Striping Plans from Fort Lowell Road to Broadway Boulevard - (PSOMAS) |
|
No |
| U-2025-036 |
Proposition 411 - Package 57 - Mission Manor III, Includes New Asphalt, ADA ramps, Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 12, T15S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) |
|
No |
| U-2025-037 |
Wetmore Road and 4th (Fourth) Avenue High-Intensity Activated Crosswalk (HAWK) - includes new Curb, Sidewalk, Access Ramps and HAWK Traffic Lights - (Kimley>Horn) |
|
No |
| U-2025-038 |
El Paso and Southwestern Greenway -- St. Mary's Road to Cushing Street - Job No. 181820-04 - (ECE) |
|
No |
| U-2025-039 |
Ajo Way Sidewalk Improvement Plans from 6th Avenue to 16th Avenue - includes new Sidewalk and ADA Ramps - (ISX) |
|
No |
| U-2025-040 |
6th Avenue Protected Bike Lanes from Speedway Boulevard to 7th Street - includes new Speed Tables, Precast Concrete Bike Curbs, Soft Hit Posts, and Striping - (WSP) |
|
No |
| U-2025-041 |
Striping Plan - Anklam Road from St. Marys Road to Silverbell Road,T14S, R13E, Section 10 (City of Tucson, Traffic Engineering) |
|
Yes |
| U-2025-042 |
Proposition 411, Spring 2025 Curb Ramp Package C, Package 58 - Desert Steppes, Sherwood Village Terrace North, and Sherwood Village Terrace South, New Curb Access Ramps Only, Located within Sec 16, T14S, R15E, G&SRM, Pima County, Arizona - (COT) |
|
No |
| U-2025-043 |
Mill & Fill with Realigned Pavement Marking Plan - San Juan Trail from La Cholla Boulevard to Mission Road - includes 3" mill and replacement of new asphalt (PAG 2) and re-striping to reduce travel lanes to 10' and adding to 6.5' bike lanes with parallel parking on south-side - (COT) |
|
No |
| U-2025-044 |
Pavement Improvement Plans at 35th Street east of Euclid Avenue Intersection - Pavement Reconstruction to Address Drainage Issues - (WSP) |
|
No |
| U-2025-045 |
New Traffic Signal Lights at Tucson Market Place Boulevard & Martin Luther King Jr. Way Intersection Improvements - includes new poles, conduit, and some sidewalk modification - (Kittelson) |
|
No |
| V-000 |
Class ''V'' - AERIAL PHOTOGRAPHS
No Records were kept Before 1962. |
- 000 - |
No |
| V-62-000 |
- 1962 - Class ''V'' - AERIAL PHOTOGRAPHS |
- 1962 - |
No |
| V-62-001 |
Large Aerial Photos of CITY SEWER FARM, Showing lands irrigated by water from plant, Number DHQ 2V-14, D&D, January 23, 1958 |
|
No |
| V-62-001A |
Large Aerial Photos of CITY SEWER FARM, Showing lands irrigated by water from plant, Number DHQ 2V-14, D&D, January 23, 1958 |
|
No |
| V-62-002 |
DESTROYED 09/07/90 Aerial photo showing ARCADIA Wash: 5th Street to Speedway Boulevard
August 1955 (DESTROYED 09/07/90) |
- Void - |
No |
| V-63-000 |
- 1963 - Class ''V'' - AERIAL PHOTOGRAPHS |
- 1963 - |
No |
| V-63-001 |
Aerial of area bounded by ROGER ROAD to PRINCE and ORACLE ROAD to FREEWAY |
|
No |
| V-63-002 |
DESTROYED 09/07/90 Aerial photos and transparencies of area bounded by Broadway Boulevard, Tucson Boulevard, 25th Street & 3rd Avenue for preliminary study of alignments of the ''BUTTERFIELD ROUTE'', ''PENETRATION ROUTE'', and ''22ND STREET GRADE SEPARATION'' (Scale: 1 inch = 100 feet ±) Flown April 29, 1963 (DESTROYED 9/7/90) |
- Void - |
No |
| V-63-003 |
Aerial photos and transparencies for final right-of-way study of ''BUTTERFIELD ROUTE'' from Tucson Cont. Access Highway to Park Avenue (Scale: 1 inch = 40 feet) Flown October 15, 1963 |
|
No |
| V-63-004 |
DESTROYED 09/07/90 Aerial photos for ''FLOWING WELLS OPENING & WIDENING DISTRICT IMPROVEMENT'' (Scale: 1 inch = 200 feet ±) Flown: April 29, 1963 (DESTROYED 09/07/90) |
- Void - |
No |
| V-64-000 |
- 1964 through 1966 - Class ''V'' - AERIAL PHOTOGRAPHS No drawing numbers were issued from 1964 Through 1966 |
- 1964 - |
No |
| V-67-000 |
- 1967 - Class ''V'' - AERIAL PHOTOGRAPHS |
- 1967 - |
No |
| V-67-001 |
Proposed Mid-1967 AERIAL PHOTOGRAPHY OF TUCSON AND VICINITY |
|
No |
| V-68-000 |
- 1968 - Class ''V'' - AERIAL PHOTOGRAPHS |
- 1968 - |
No |