Maps and Records

Construction Plans


Plan # Description Film Roll Scanned
E-83-007 Wilmot Development Drainage Channel Improvement (Trimble Engineers) 108 Yes
E-83-008 Pantano Wash Bank Stabilization - Broadway Boulevard and Prudence Road (Simons, Li, & Associate) 81 Yes
E-83-009 Atterbury Wash Bank Protection -- West Bank 600 Feet South of Golf Links Road (CBA Engineering) 81 Yes
E-83-010 - Void - Santa Cruz River Bank Protection -- Mission Lane to 29th Street (Cella Barr Associates Engineering) NOTE: Also See D-83-005 and Also See E-87-015 - Void - No
E-83-011 Rio Nuevo -- Cushing Street Wash Cut-off Wall Detail for existing Pedestrian Bridge) 79 Yes
E-83-012 Pantano Wash -- Lot 10 - Monte Catalina Estates -- Additional Bank Protection Improvements (Trimble Engineering) 88 Yes
E-83-013 Pantano Wash -- Profile and Cross Section 79 Yes
E-83-014 Santa Cruz River: Additional Dike Protection with Roger Road W.W.T.P. Sewage Improvments 107 Yes
E-83-015 Pantano Wash: North of Speedway, Flood Damage Repairs 79 Yes
E-83-016 West Speedway Wash Bank Protection 81 Yes
E-83-017 New Santa Cruz River Stabilization at Valencia Road (RGA Engineering) Yes
E-83-018 1st Avenue Bridge at the Rillito River -- Bank and Scour Protection (Blanton & Co.) No
E-84-000 - 1984 - Class ''E'' - DRAINAGE STUDIES: Contour Maps, (not structures) City Farm Ditches, Rivers, Arroyos, Drainageway Grading, and Bank Protection - 1984 - No
E-84-001 1st Avenue at the Rillito River -- Soil Cement Bank Stabilization 79 Yes
E-84-002 Lakeside No. 2 Apartments Bank Protection 81 Yes
E-84-003 Pantano Wash Bank Protection (S.C.S.) Pima County Department of Transportation -- After October Flood 79 Yes
E-84-004 Santa Cruz River South of Ajo Way (Kostka Avenue) 79 Yes
E-84-005 Pantano Wash bank protection -- Speedway Boulevard to Broadway Boulevard -- District bank improvements (Cella Barr & Associates) 115 Yes
E-84-006 Sundown Townhomes -- Drainage Improvements (Cella Barr & Associates) 83 Yes
E-84-007 Tucson Medical Center -- Alamo Wash -- Arcadia Wash Channelization (Cella Barr & Associates) 83 Yes
E-84-008 Sunrise Plaza, Bank Protection -- Pantano Wash -- West Bank Before the October 1983 Flood 80 Yes
E-84-009 Santa Cruz River, West branch channelization -- Phase II 81 Yes
E-84-010 Santa Cruz River stabilization and bridge repair at Grant Road (Ruiz) 84 Yes
E-84-011 Lakeside Dam and Spillway Reconstruction (Simons, Li & Associates) 85 Yes
E-84-012 Christmas Wash -- Drainage improvements (Lovstorm & Associates) Yes
E-84-013 Rose Hill Wash -- West Bank Protection (Thompson - Murphy Engineering) 83 Yes
E-84-014 Alamo Wash -- South of Grant Road -- Drainage Study No
E-84-015 Alamo Wash -- at Pima Street -- Drainage Improvements 89 Yes
E-84-016 Silvercroft Wash -- Grant Road to Speedway Boulevard 125 Yes
E-84-017 - Protested - Not Built - El Rio Miscellaneous Drainage Improvements -- El Rio Drive & Aztec Street Note: See R-85-010 (Dooley, Jones, And Associates, DJA) Protested, Not Built RefOnly No
E-84-018 Santa Cruz River Stabilization North of Fort Lowell Road (VEA) 83 Yes
E-84-019 Bank Protection -- West Bank of the Santa Cruz River -- North of Ajo Way (F&D Engineering) 102 & 107 Yes
E-84-020 Arcadia Wash -- Rosemont Boulevard to Beverly Avenue -- District Bank Protection Improvement 125 Yes
E-85-000 - 1985 - Class ''E'' - DRAINAGE STUDIES: Contour Maps, (not structures) City Farm Ditches, Rivers, Arroyos, Drainageway Grading, and Bank Protection - 1985 - No
E-85-001 Pantano Apartments -- Avenida Guillermo & 27th St To Pantano Rd & Palma St -- Channel Improvements (Dooley-Jones & Associates : DJA) NOTE: Paper Copy 112 Yes
E-85-002 Drainage Improvements for Oak Park Townhomes -- Lots 1 through 40 (Buck Lewis Engineering) NOTE: Paper Copy Only 119 Yes
E-85-003 Baniff West Repairs -- North of Calle Eunice 125 Yes
E-85-004 Pantano Wash @ Golf Links Road, Rillito River @ Campbell Avenue, Craycroft Wash @ River Road and Craycroft Road NOTE: PIMA COUNTY HAS AS-BUILTS, P.C. W.O. Number 4BBSTM, Number 4BBRGL & Number 4BCRIL Yes
E-85-005 Midway Wash -- South of Speedway Boulevard -- Bank Protection (AMP Engineering) NOTE: Paper Copy Only 119 Yes
E-85-006 Grant Road West of Tucson Boulevard -- Drainage Improvements (Johnson-Brittain & Associates) 97 Yes
E-85-007 Rolling Hills Wash Bank Protection -- Sarnoff Drive to Camino Seco (RS Engineering) 125 Yes
E-85-008 Rose Hill Wash Channel Protection -- North of Grant Road 89 Yes
E-85-009 Flowing Wells Wash Stabilization, La Cholla Boulevard to Fairview Avenue Phase 1 & 2 NOTE: AS BUILT on 11-12-87, 29 Plan Sheets 107 Yes
E-85-010 Cemetery Wash Bank Protection -- La Cholla Boulevard to Fairview Avenue 83 Yes
E-85-011 Northridge Apartments -- offsite Drainage Channel 107 Yes
E-85-012 Coronado Wash Drainage Improvements (Cella Barr & Associates Engineering) 84 Yes
E-85-013 Bank Protection North of Fair Street at Mountain Avenue 97 Yes
E-85-014 Airport Wash West 0f I-19 Channel Protection 86 Yes
E-85-015 Alamo Wash -- Grant Road to Broadway Boulevard -- Drainage Study 119 Yes
E-85-016 Bronx Wash -- 4th Avenue to 6th Avenue -- Spot Improvements (Corrales Engineering) No