Maps and Records

Construction Plans


Plan # Description Film Roll Scanned
U-2024-017 Proposition 411 Collector Street Package 24 - Tucson Boulevard & Elm Street - Includes New Asphalt, ADA ramps, Raised Crosswalk/Speed Table, Treatment is 3" Mill/Infill, Pag 2, PG 76-22 TR+ (Non-RAP), Located within Sec 5 & 8, T14S, R14E, G&SRM, Pima County, Arizona - (COT) Yes
U-2024-018 Proposition 411 Phase 1, Package 25 - Kennedy Park Estates, San Xavier Addition, and Freedom Homes - Mission Road (Frontage), Calle La Paz, Calle Guadalajara, Calle Acapulco, Veterans Place, San Rafael Place, Ajo Way (Frontage), Freedom Drive, Circle A Drive, Circle B Drive - Includes New Asphalt and ADA ramps, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 27, T14S, R13E, G&SRM, Pima County, Arizona - (COT) Yes
U-2024-019 12th Avenue Improvement Project (Offsite/PIA) STA 203+47.63 to 206+69053 at El Guero Canelo - 12th Avenue and Utah Street - includes new curb, ADA ramps, driveways, scupper and sidewalk - () No
U-2024-020 Offsite paving and striping plans for 34th Street - Santa Cruz Lane to unnamed road to the east - includes widening the road by 5', new curb, sidewalk, scuppers, and ADA ramps, and return at the unnamed road intersection - (EEC) No
U-2024-021 VOID - VOID - VOID No
U-2024-022 Proposition 411 Phase 1, Package 27 - Rolling Hills - Rolling Ridge, Estes Park, Arroyo Ridge, 29th Street, Prudence Road, Kenyon Drive, Sarnoff Drive, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Collector Street Treatment is 3" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Local Street Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Alternate Bid Area Local Street Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 16, 20, 21, 22, T14S, R15E, G&SRM, Pima County, Arizona - (COT) Yes
U-2024-023 Proposition 411 Phase 1, Package 26 - Amphi Area - Garden Homes, Sawtelle Place, and Pastime Acres - Yavapai Road, Mohave Road, Navajo Road, Estrella Avenue, Incas Avenue, Fontana Avenue, Geronimo Avenue, Los Altos Avenue, 2nd Avenue, Windsor Street, Pastime Road, Knox Drive, Smoot Drive, King Road, Balboa Avenue, Castro Avenue, Includes New Asphalt, ADA ramps, Speed Humps and Speed Tables, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 25, T13S, R13E, G&SRM, Pima County, Arizona - (COT) No
U-2024-024 Proposition 411 Phase 1, Package 28 - Vista Del Rio, The Enclave, and Rancho Perdido Estates - Bronze Place, Camino Del Rio, Camino Montaraz, Desert Arbors Street, Dos Mujeres Road, Golden River Lane, La Cienega Drive, Park View Drive, Pewter Place, Rio Vista Circle, Super Chicken Drive, Desert Links Drive, Desert Pearl Drive, Dos Hombres Road, Essel Drive, La Chiquita Avenue, Rio Verde Drive, Marquise Drive, Hartwick Court, Pearl Court, Hartwick Avenue, Ivory Court, Sedona Court, Cleary Way, Marquise Court, Pantano Road, Camino Bavispe, Camino Perdido, Avenida Empalme, Includes New Asphalt, ADA ramps, Speed Humps, Treatment is 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), Located within Sec 32, T13S, R15E, G&SRM, Pima County, Arizona - (COT) No
U-2024-025 Proposition 411 Phase 1, Package 29 - Altadena Heights - Cherry Street, 25th Street, 27th Street, 28th Street, Warren Avenue, Includes New Asphalt and ADA ramps, Cherry Ave Treatment is 2.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP), All Other Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+ (Non-RAP) Located within Sec 19, T14S, R14E, G&SRM, Pima County, Arizona - (COT) No
U-2024-026 Proposition 411 Phase 1, Package 30 - Ward 5 - Package 1 - Mortimore Addition, Desert Shadows, Summerfield, Desert View; Package 2 - Southland Park & Los Ranchitos, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment: Package 1 - 1.5" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP; Package 2 - 2.0" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP , Located within Sec 4, 5, 7, 9, T15S, R14E, G&SRM, Pima County, Arizona - (COT) Yes
U-2024-027 Proposition 411 Phase 1, Package 31 - Mission Manor, Mission Heights, Missiondale Park, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is ???, Located within Sec 11 & 12, T15S, R13E, G&SRM, Pima County, Arizona - (COT) No
U-2024-028 Proposition 411 Phase 1, Package 32 - Ward 4 - Vista Del Prado & Escalante Heights, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 30, T14S, R15E, G&SRM, Pima County, Arizona - (COT) No
U-2024-029 Proposition 411 Collector Street Package 33 - Stella Road: Wilmot Road to Camino Seco - Includes New Asphalt and ADA ramps, Treatment is 3' Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 28, 29, 30, T14S, R15E, G&SRM, Pima County, Arizona - (COT) Yes
U-2024-030 Golf Links Overhead Sign Attachment plans - Includes retrofit of new signs onto existing cantilever sign structures at 8 locations, with 6 on Golf Links Road between Ajo Way and Swan Road, one on Aviation Parkway between Palo Verde Way and Alvernon Way, and one Alvernon Way north of Palo Verde Road - (Kimley>Horn). No
U-2024-031 Proposition 411 Phase 1, Package 34 - The Crossings at Riverbend & Tucson Auto Mall - Applesauce Court, April Drive, Raspberry Court, Samantha Grove Drive, Courtney Crossing Lane, Ethan Crossing Lane, Trevor Drive, Camino De La Tierra, Fairview Avenue, Old Oracle Road, Sport Road, Auto Sprint Road, Circuit Road, Competition Road, Turbo Road, Includes New Asphalt, and ADA ramps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 8 & 23, T13S, R13E, G&SRM, Pima County, Arizona - (COT) No
U-2024-032 Collector Street Repaving and Restriping Program (Striping/Signing Plan Only) - Tucson Boulevard: Grant Road to 6th Street, Located within Secs 5 & 8, T14S, R14E, G&SRM, Pima County, Arizona (COT) Yes
U-2024-033 FY 24/25 HSIP HAWK or Bike HAWK at 9 Different Locations - 6th Avenue & District Street, 22nd Street & Rosemont Avenue, Ajo Way & Valley Road, Broadway Boulevard & Maguire Avenue, Broadway Boulevard & Mountain View Avenue, Golf Links Road & Golf Links Circle (Bicycle HAWK), Pima Street & Rook Avenue, & Oracle Road & Simmons Road (Bicycle HAWK), Speedway Boulevard & Beverly Avenue (Bicycle HAWK) - (Kimley>Horn) No
U-2024-034 Wrightstown Catalina Apartments Off-Site Improvement Plans - on Wrightstown Road west of Pantano Road: includes relocation of existing driveway, relocation of existing bus stop and shelter, along with new curb, access ramps, and sidewalk - (Kimley>Horn) No
U-2024-035 Tanque Verde Road and Houghton Road Off-Site Improvement Plans - Circle K - Includes new driveways on Tanque Verde Rd & on Houghton Rd, new curb, sidewalk, access ramps, asphalt, drainage and scuppers - (Kimley>Horn) No
U-2024-036 Private Improvement Agreement Plan for Goodwill Tucson - 1770 S. Cherrybell Stavenue - along both Cherrybell Stravenue & Silverbell Road - Including New Asphalt, Driveways, Vertical Curb, Sidewalk, Access Ramps and Scuppers - (DOWL). No
U-2025-001 Mission Road & Via Ingresso Traffic Signals - (Rick)(NOTE: Plans "AS RECEIVED" 1/10/2025) Yes
U-2025-002 Proposition 411 Collector Street Package 35 - Calle Santa Cruz: Irvington Road to Valencia Road - Includes New Asphalt, sidewlaks, and ADA ramps, Treatment is Mill & Replace, PAG Mix 2, PG 76-22 TR+, Located within Sec 2, T15S, R13E, G&SRM, Pima County, Arizona - (Kimley>Horn) No
U-2025-003 HSIP Flashing Yellow Arrows & Backplates - at Broadway Boulevard & Houghton Road, Fifth (5th) Street & Wilmot Road, Golf Links Road & Craycroft Raod, Grant Road & First (1st) Avenue, Grant Road & Oracle Road, Irvington Road & Houghton Road, Speedway Boulevard & Alvernon Way, Speedway Boulevard & Prudence Road, St. Mary’s Road & Granada Avenue, Tanque Verde Road & Houghton Road, Tanque Verde Road /Paseo Rancho Esperanza, Valencia Road & Palo Verde Road - (PSOMAS) No
U-2025-004 HSIP Flashing Yellow Arrows, Backplates and Lenses - 22nd Street & Sixth (6th) Avenue, Ajo Way & Forgeus Avenue, Ajo Way & La Cholla Boulevard, Ajo Way & Sixth (6th) Avenue, Broadway Boulevard & Craycroft Road, Golf Links Road & Harrison Road, Grant Raod & Forbes Boulevard, Grant Road & Wilmot Road, Irvington Road & Kolb Road, Old Spanish Trail & Harrison Road, Prince Road & Fairview Avenue, River Road & Campbell Avenue - (PSOMAS) No
U-2025-005 HSIP Intersection Improvements, Flashing Yellow Arrows - 29th Street & Craycroft Road, 29th Street & Swan Road, Auto Mall Drive & Oracle Road, Ft. Lowell Road & Dodge Boulevard, Golf Links Road & Swan Road, Grant Road & Swan Road, River Road & Hacienda del Sol, Roger Road & Flowing Wells Road, Valencia Road & Santa Clara Avenue, Via Ingresso & Mission Road, Wrightstown Road & Pantano Road - (Kimley>Horn) No
U-2025-006 HSIP Intersection Improvements, Positive Offset and Flashing Yellow Arrows - at Broadway Boulevard & Jessica Avenue, Drexel Road & Tucson Boulevard, Grant Road & Fairview Avenue, Irvington Road & Mission Road - (Kimley>Horn) No
U-2025-007 Striping Plan - 6th Avenue from Drexel Road to Valencia Road T15S, R13E, Section 12 (City of Tucson, Traffic Engineering) Yes
U-2025-008 Proposition 411, Package 36 - 2025 Surface Treatment Package A - Butterfield Ranch, Summit Park, Manana Grande, Concord Hill, Vista Del Sierras, and Rolling Hills Vista Neighborhoods - Curb, Sidewalk, and ADA ramps, (Treatment is Chip Seal & Slurry Seal to be Completed by Future Construction), Located within Sec 20 & 21, T14S, R15E, G&SRM, Pima County, Arizona - (COT) Yes
U-2025-009 Houghton Road and Mary Ann Cleveland Way Ramp and Guardrail Improvements - Including New Access Ramps at the SE Corner of Houghton Rd & Mary Ann Cleveland Way with New MUP and Sidewalk tie-in, and also New Guardrail at MAC Way & Atterbury Wash Way (SW Corner) and MAC Way & Steve Street (SW Corner) - (Kimley>Horn) No
U-2025-010 Western Hills Neighborhood Revitalization Project - Includes Mill and Replacement of Asphalt, New Raised Speed Table Crossing Walk, Replacement of Speed Tables & Humps, New Sidewalk, and New Access Ramps - (Kimley>Horn) No
U-2025-011 Proposition 411, Package 37 - Valley View & Sutton Place, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 29, T14S, R15E, G&SRM, Pima County, Arizona - (COT) Yes
U-2025-012 Proposition 411 Phase 1, Package 38 - Ward 4 - Pine Grove, Palm Grove Clusters, Olive Grove, Includes New Asphalt, ADA ramps, and Speed Humps, Treatment is 2" Asphalt Plane/Mill & Replace, PAG Mix 2, PG 76-22 TR+, Non-RAP, Located within Sec 32, T14S, R15E, G&SRM, Pima County, Arizona - (COT) Yes
U-2025-013 Proposition 411 - Collector Streets Rehab Project - Park Avenue: Fort Lowell Road to 2nd Street - Includes New Asphalt and Curb Access Ramps, Park Ave Treatment from Fort Lowell Rd to Adams Street & Park Ave from Speedway Boulevard to 2nd Street is 3" Asphalt Plane/Mill & Replacement, PAG Mix 2, PG 76-22 TR+, Non-RAP, Park Avenue Treatment from Adams Street to Speedway Boulevard is Micro-Surfacing, Aggregate Type II, CQS-1HP w/ 4% SBS Polymer (MSE), Located within Sec 31, T13S, R14E, Sec 6 & 7, T14S, R14E G&SRM, Pima County, Arizona - (COT) Yes
U-2025-014 Park Avenue Pavement Marking Project - from Fort Lowell Road to Speedway Boulevard - (Kimley > Horn) No
U-2025-015 Proposition 411, Package 39 - Surface Treatment Package B - Glen Heather, Manana Vista, & Miramonte Neighborhoods, Treatment is Micro-Milling, Crack Filling and Patching, AR Chip with Heavy Type III Slurry and Type II Slurry. Located within Sec 18, T14S, R15E, G&SRM, Pima County, Arizona - (COT) Yes
U-2025-016 Proposition 411, Phase 1, Package 40 - Saddlewood Ranch, Enchanted Hill, Oak Park, New Curb Access Ramps Only, Located within Sec 4 & 27, T14S, R13E, Sec 3 & 10, T15S, R13E, G&SRM, Pima County, Arizona - (COT) Yes
U-2025-017 Kenyon Drive and Sarnoff Drive Enhanced Bicycle & Pedestrian Safety with Speed Calming Signing and Marking Improvement plans - on Kenyon Drive between Pantano Road and Old Spanish Trail and on Sarnoff Drive between Broadway Boulevard and Pantano Parkway - includes new speed tables, center curbed pedestrian refuge, flexible plastic bollards, modular speed humps, enhanced striping and markings - (Kimley>Horn) No
V-000 Class ''V'' - AERIAL PHOTOGRAPHS No Records were kept Before 1962. - 000 - No
V-62-000 - 1962 - Class ''V'' - AERIAL PHOTOGRAPHS - 1962 - No
V-62-001 Large Aerial Photos of CITY SEWER FARM, Showing lands irrigated by water from plant, Number DHQ 2V-14, D&D, January 23, 1958 No
V-62-001A Large Aerial Photos of CITY SEWER FARM, Showing lands irrigated by water from plant, Number DHQ 2V-14, D&D, January 23, 1958 No
V-62-002 DESTROYED 09/07/90 Aerial photo showing ARCADIA Wash: 5th Street to Speedway Boulevard August 1955 (DESTROYED 09/07/90) - Void - No
V-63-000 - 1963 - Class ''V'' - AERIAL PHOTOGRAPHS - 1963 - No
V-63-001 Aerial of area bounded by ROGER ROAD to PRINCE and ORACLE ROAD to FREEWAY No
V-63-002 DESTROYED 09/07/90 Aerial photos and transparencies of area bounded by Broadway Boulevard, Tucson Boulevard, 25th Street & 3rd Avenue for preliminary study of alignments of the ''BUTTERFIELD ROUTE'', ''PENETRATION ROUTE'', and ''22ND STREET GRADE SEPARATION'' (Scale: 1 inch = 100 feet ±) Flown April 29, 1963 (DESTROYED 9/7/90) - Void - No
V-63-003 Aerial photos and transparencies for final right-of-way study of ''BUTTERFIELD ROUTE'' from Tucson Cont. Access Highway to Park Avenue (Scale: 1 inch = 40 feet) Flown October 15, 1963 No
V-63-004 DESTROYED 09/07/90 Aerial photos for ''FLOWING WELLS OPENING & WIDENING DISTRICT IMPROVEMENT'' (Scale: 1 inch = 200 feet ±) Flown: April 29, 1963 (DESTROYED 09/07/90) - Void - No
V-64-000 - 1964 through 1966 - Class ''V'' - AERIAL PHOTOGRAPHS No drawing numbers were issued from 1964 Through 1966 - 1964 - No
V-67-000 - 1967 - Class ''V'' - AERIAL PHOTOGRAPHS - 1967 - No
V-67-001 Proposed Mid-1967 AERIAL PHOTOGRAPHY OF TUCSON AND VICINITY No