Maps and Records

Construction Plans


Plan # Description Film Roll Scanned
I-2022-021 State Highway Casa Grande - Tucson Interstate Highway 10 (I-10) Ruthrauff Road - El Camino Del Cerro TI - (ADOT). NOTE: Electronic plans only from ADOT. Not Record Drawings. Yes
I-2022-022 Pima County Northwest Service Center Miracle Mile Offsite Improvements - includes new bus bay, median cut and left turn lane, right turn lane, driveway, curb, sidewalk, ADA ramps, and landscaping on State Route 77 Miracle Mile between Fairview Avenue & El Burrito Avenue - (ADOT) No
I-2022-023 12th Avenue Improvement Project - Drexel Road to Oklahoma Street - Green Stormwater Infrastructure Improvements - Includes lane reduction from project I-2020-007 and removes those extruded curb street buffer elements and replaces them with water retention buffer elements with new vertical and header curb along with new irrigation and vegetation - (Kimley-Horn) No
I-2023-001 Offsite Improvement Plans for I-10 International (Airpark 10) - Along Los Reales Road and Alvernon Way, including new widen roads, asphalt multi-use path, concrete sidewalk, ADA Ramps, header, curb, driveways, drainage retention areas, and new striping - (Rick Engineering) No
I-2023-002 Offsite Improvement Plans for Tucson Commerce Center - Palo Verde Road, Valencia Road and Alvernon Way - with new curb, asphalt, driveways, ADA ramps, scuppers and drainage - (EPS Group) No
I-2023-003 Offsite Paving Improvement plans for First Avenue & Limberlost Drive - at southwest corner of intersection - includes new turn lanes, driveways, storm drains, pipe runs, asphalt, curb, ADA Ramps, and sidewalk with fire hydrant and traffic pole relocation - (Atwell) No
I-2023-004 Proposition 411 Traffic Signal and Intersection Improvements at Broadway Boulevard & Pantano Road - includes new medians, ADA Ramps, sidewalk, curb, traffic signal poles, traffic sign controller and striping - (PSOMAS) No
I-2023-005 1st Street Drainage Improvements - 1st Street, Euclid Avenue to Alleyway - includes replacing 18" x 11" CPM with new covered concrete channel with adjoining and drain connected concrete planters, and new sidewalk - (AECOM) No
I-2023-006 Golf Links Road - Pantano Parkway ADA Ramp & Traffic Signal Intersection Improvements & Bridge Repairs, includes Median Modification with New Curb, ADA Ramps, Sidewalk, Traffic Signals, Electrical Conduit, Asphalt, Signage, Pavement Markings, and Bridge repairs - (WSP) Yes
I-2023-007 Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage - (Bowman) No
I-2023-008 Water Harvesting Improvement Plan for Linden Street S2S Uplift - along Bronx Wash at intersections of 2nd Avenue and 5th Avenue - includes modification to channel along with new header, asphalt, root barrier, weep holes, rip rap and vegetation - (West Consultants) No
I-2023-009 Offsite Paving Plans for Parcel 141-06-009J at the SE corner of Valencia Road and Kolb Road - includes new right turn lane on Kolb Rd and new driveway off of Kolb Rd with new curb, asphalt, and bridge over drainage channel - (Baker & Associates) No
I-2023-010 Offsite Improvement Plans for Project Smoke Tree on Wilmot Road from Union Pacific Rail Road to Julian Wash - Includes new Business Entrances, ADA Ramps, Sidewalk, Curb, Asphalt, and Fog Coat of existing roadway (Kimley>Horn) No
I-2023-011 El Paso and Southwestern Greenway at 36th Street: Kino Parkway to Ajo Detention Basin - includes new or rebuilt multi-use path, curb, header, ADA Ramps, and bus shelters - majority of the work on Campbell Avenue - (Kimley>Horn) No
I-2023-012 Offsite Paving Plans for Rodeo Addition No. 4 (Seq# 2023_____) with new public roads Gallo Way & Ida Lane and private roads Ida Lane & Rosetta Court, includes new asphalt, ADA Ramps, Curb (both vertical and wedge) , Sidewalk, Scuppers, and Grate-style catch basin (Trench Box drainage) - (Rick Engineering) No
I-2023-013 HAWK or BikeHAWK Signal Plans Group 1 - ARPA Funded at 14 (8 with this group) locations Include new ADA Curb Access Ramps, Sidewalk, Traffic Signals and Conduit, Pavement Markings and Utility Coordination - at: Alvernon Way & Seneca Street / Justin Lane, Country Club Road & Waverly / Seneca Street, Euclid Avenue & Seneca Street, Fort Lowell Road & Palo Verde Avenue, Irvington Road & 3rd Avenue / Annapolis Drive, Kino Parkway & St. Isadore Street, Stone Avenue & Ventura Street, Wilmot Road & Eli Drive - (PSOMAS) NOTE: Six locations removed to Plan I-2024-011 Group 2: Euclid Avenue & 2nd Street, Fort Lowell Road & Geronimo Avenue, Grant Road & Coyote Drive, Prince Road & Los Altos Avenue, Speedway Boulevard & Belvedere Avenue, Speedway Boulevard & 2nd Avenue. No
I-2023-014 The Place at Rita Ranch 2 (apartments) at Houghton Road & Jumping Cholla Road - with new lane on south-half of Jumping Cholla Rd with new new entrance off Jumping Cholla Rd and two new entrances off Houghton Rd - includes new asphalt, curb, sidewalk, and ADA ramps - (Atwell) No
I-2023-015 The Place at Rita Ranch 1 (apartments) at Houghton Road & Jumping Cholla Road - with new lane on north-half of Jumping Cholla Rd with new new entrance off Jumping Cholla Rd and one new entrances off Houghton Rd - includes new asphalt, curb, sidewalk, and ADA ramps - (Atwell) No
I-2023-016 Arroyo at Los Reales Spine Road Infrastructure Improvement Plans (Wilmot Storage Development Spine Road Infrastructure and Wilmot Road Improvements) - Includes extending existing road as new collector Rincon Ridge Drive from Los Reales across and down to Wilmot Road and a new right turn lane on Wilmot Road, with new asphalt, curb, sidewalk, ADA access ramps, driveways, and underground RCP drainage - (Kimley>Horn) No
I-2023-017 Public Improvements for Hub V (5) Tucson - at Northwest corner of 1st Street & Park Avenue - includes partial reconstruction of Park Avenue and 1st Street and complete reconstruction of 15' alley for length of property between 1st Street and Speedway Boulevard, with new asphalt, curb, sidewalk, sidewalk scuppers, and ADA access ramps - (Grenier Engineering) No
I-2024-001 Stone Avenue Cycle Track Extension - Alameda Street to Ochoa Street - includes new pinned extruded curb medians, GSI water harvesting areas, roadway lane reduction, new crosswalk near the Main Library, and new bicycle path - (PSOMAS) No
I-2024-002 Full Reconstruction Plans for Euclid Avenue, 18th Street, Warehouse Avenue, and Cherry Avenue Improvement Plans - includes replacement of asphalt with concrete roadway and goes on Euclid Av from 16th St to 18th Street, and along 18th St from Euclid av to Warehouse Av, and on Warehouse Av from 18th St to Cherry Av, and on Cherry Av from Warehouse Av to 22nd St, includes full reconstruct and replacement of asphalt with concrete roadway, new wedge curb on 18th St from Euclid Av to Park Av, new ADA ramps, driveways, and curb - (EEC) No
I-2024-003 Partners on Fourth Pad - Private Improvements - including new pavement, curb, sidewalk, ADA ramps, tree wells, driveways on north-half of Herbert Avenue, new road from Herbert Avenue to 4th Avenue, along 4th Avenue, Stevens Avenue, and 8th Street - (Grenier Engineering Inc.) No
I-2024-004 Offsite Improvement Plans for Drexel Heights, Lots 1 - 10, includes widening and sidewalk on Drelex Road and new curb and sidewalk on Fontana Avenue, with new asphalt, curb, sidewalk, ADA Ramps, sidewalk scuppers, drainage channels, and driveways - (Oracle Engineering Group, Inc) No
I-2024-005 Improvement Plans for Los Reales Suitability Campus - includes reconstruction of Los Reales / Craycroft Road / Garden Stone Drive intersection with connection to Garden Stone Drive, asphalt Multi-Use Path (MUP) on south-side of Los Reales from Swan Road to Craycroft Road and then continues east on the south-side of Garden Stone Drive for approximately another 1.8 miles, a DG path south of the new MUP that connects with the asphalt path, with new asphalt, curb, sidewalk, ADA Ramps, RCP & Drainage, and a pork chop island at the NW corner of intersection of Los Reales & Craycroft - (DOWL) No
I-2024-006 Road Recovery Proposition 101 Rehabilitation Package 14. Includes 6th Avenue from Valencia Road to Los Reales Road - includes Mill and Replacement of asphalt, new ADA ramps, curb, and new 42" RCP storm drain crossing from Elvado Road to El Vado Wash for PCRFCD - (Kimley>Horn) No
I-2024-007 Grant Road and Fairview Avenue Off-site Improvement Plans - Pascua Yaqui Tribe Casino - includes modification to Grant Rd & Fairview Av intersection and widening of Fairview south of Grant Rd, with new right turn lane and new pork chop island at the at Flowing Wells Road and private drive intersection, and modification of medians on Grant Rd, with new asphalt, curb, sidewalk, ADA ramps, medians and catch basin relocation - (Kimley>Horn) No
I-2024-008 Offsite Improvement Plans for: Capstone Apartments at the Southeast Corner of Speedway Boulevard and Euclid Avenue - includes the lengthening of the right turn lane on Euclid Av with new sidewalk, curb, and asphalt with relocation of street lights and conduit and other utilities, along with pork chop pedestrian islands on 1st Street and Euclid Avenue, along with new sidewalk and curb in north-south alley between Euclid Avenue and Tyndall Avenue - (Rick) No
I-2024-009 Wingate Boulevard Paving Plans from Escalante Road to between Lindrbrook Drive and Brandywine Drive - includes new asphalt, curb, sidewalk, curb access ramps, drainage, and striping - (Rick) No
I-2024-010 36th Street Walkablilty and Roundabout Project - Euclid Avenue to Country Club Road - Includes reconstructed intersection at Campbell Avenue & 36th St with a Roundabout, also includes new Shared-Use Path (SUP), sidewalk, asphalt, ADA Ramps, curb, stamped concrete sidewalk, Drainage Spillway, Catch Basins and new RCP Storm Drain, and Street Lights - (Kimley>Horn) No
I-2024-011 HAWK or BikeHAWK Signal Plans Group 2 - ARPA Funded at 14 (6 with this group) locations Include new ADA Curb Access Ramps, Sidewalk, Traffic Signals and Conduit, Pavement Markings and Utility Coordination - at: Euclid Avenue & 2nd Street, Fort Lowell Road & Geronimo Avenue, Grant Road & Coyote Drive, Prince Road & Los Altos Avenue, Speedway Boulevard & Belvedere Avenue, Speedway Boulevard & 2nd Avenue - (PSOMAS) NOTE: These 6 locations removed from Plan I-2023-013 Group 1. No
I-2024-012 Pavement Improvement Plans for Colossal Cave Road: Acacia Elementary to Old Vail Middle School to reconstruct and widen approximately 4600 feet of Colossal Cave Road, including the construction of a center two-way left turn lane, and reconstruction of two at grade U.P.R.R. crossings, culverts, and landscaping. Located within Sec 9 & 16, T16S, R16E, G&SRM, Pima County, Arizona (Parsons Brinkerhoff) (AS BUILT DATED: 09/01/2017) NOTE: Records transferred to COT by Pima County as electronic copies only, see Pima County for originals. Yes
I-2024-013 Offsite Public Paving Improvements for Trotter Sisters Drive, Phase 1 to serve Hanson Ridge, Lots 1-200. Located in Sec 9 & 16, T16S, R16E, G&SRM, Pima County, Arizona (Baker & Associates Engineering, Inc.) (As-Received) NOTE: Records transferred to COT by Pima County as electronic copies only, see Pima County for originals. Yes
I-2024-014 VOID - VOID - VOID - SEE I-2024-015 -- Intersection Improvements for Colossal Cave Road and Trotter Sisters Drive, Including New Signalized Intersection, Pavement Widening and Shared-Use Path, Located within Sec 9 & 16, T16S, R16E, G&SRM, Pima County, Arizona (Baker & Associates Engineering, Inc.) NOTE: Records transferred to COT by Pima County as electronic copies only, see Pima County for originals. No
I-2024-015 Intersection Plans for Colossal Cave Road and Trotter Sisters Drive - includes new Traffic Lights, new turn lanes, asphalt, curb, asphalt path, and ADA ramps - (Baker & Associates Engineering) No
I-2024-016 Storm to Shade Roadway Narrowing Plans for a Portion of Teton Road - east of 6th Avenue and south of Challenger Middle School - includes reducing the road width to 20' with new thickened edge along southern EOP and water harvesting area south of the asphalt - (Wilder Landscape Architects) No
I-2024-017 Offsite Public Improvement Plan for Escalante Road & Evergreen Avenue, for Evergreen an FLD Subdivision Lots 1 - 53, includes new curb, ADA ramps, street entrance (Sage Green Drive) , sidewalk, supper, and drainage on Escalante Road with new curb, ADA ramps street entrances (Emerald Green Drive & Olive Green Drive), sidewalk, supper, and median modification for new turn lane, and drainage on Evergreen Avenue - (WLB) No
J-00-000 - 0000 - Class ''J'' - WATER MAINS: Old Lines, Valves, etc. (current info at Water Department) NOTE: All Plans from J-001 through J-62-002 was turned over to the Water Department on March 26, 1964. - 0000 - No
J-62-000 - 1962 - J” WATER MAIN: Old Lines, Valves, etc. (current info at Water Department) - 1962 - No
J-62-001 - Void - - Void - No
J-62-002 - Void - - Void - No
J-62-003 CITY WELL SITE - PRISON - FARM -- NOTE: Water Main Plans at Water Dept. 13 Yes
J-63-000 - 1963 - Class ''J'' - WATER MAINS: Old Lines, Valves, etc. (current info at Water Department) - 1963 - No
J-63-001 - Void - - Void - No
J-63-002 TRANSFERRED to Water Dept. Yes
J-64-000 - 1964 - Class ''J'' - WATER MAINS: Old Lines, Valves, etc. (current info at Water Department) All Plans from J-1 through J-62-002 was turned over to the Water Department on March 26, 1964. NO PLANS ISSUED IN 1964 - 1964 - No
J-65-000 - 1965 - Class ''J'' - WATER MAINS: Old Lines, Valves, etc. (current info at Water Department) All Plans from J-1 through J-62-002 was turned over to the Water Department on March 26, 1964. NO PLANS ISSUED IN 1965 - 1965 - No
J-66-000 - 1966 - Class J” WATER MAIN: Old Lines, Valves, etc. (current info at Water Department) - 1966 - No
J-66-001 WATER MAIN SUPPORT, PANTANO BRIDGE (BROADWAY) NOTE: Water Main Plans at Water Dept. No
J-67-000 - 1967 - Class J” WATER MAIN: Old Lines, Valves, etc. (current info at Water Department) - 1967 - No